循环水排水及中水混合回用于冷却水系统的可行性试验

侯文龙 李皞 桑俊珍

电力建设 ›› 2012, Vol. 33 ›› Issue (7) : 69-72.

PDF(1030 KB)
PDF(1030 KB)
电力建设 ›› 2012, Vol. 33 ›› Issue (7) : 69-72.
发电技术

循环水排水及中水混合回用于冷却水系统的可行性试验

  • 侯文龙,李皞,桑俊珍
作者信息 +

Feasibility Test of Cooling Water System Using Mixture of Circulating Water Drainage and Reclaimed Water

Author information +
文章历史 +

摘要

通过混凝澄清试验、动态模拟试验和电化学腐蚀试验,研究了循环水排水及该排水与中水按照一定比例混合的水回用于电厂辅机循环冷却水系统的可行性和控制工艺,为火力发电厂节水工作提供了新的方法和依据。

Abstract

Through coagulation clarification test, dynamic simulation test and electrochemical corrosion test, this paper studied the feasibility and control technology of circulating cooling water system for auxiliary equipment in power plant, which used the mixture of circulating water drainage and reclaimed water. The research results could provide a new method and basis for the Water saving work in thermal power plants.

引用本文

导出引用
侯文龙 李皞 桑俊珍. 循环水排水及中水混合回用于冷却水系统的可行性试验[J]. 电力建设. 2012, 33(7): 69-72
Feasibility Test of Cooling Water System Using Mixture of Circulating Water Drainage and Reclaimed Water[J]. Electric Power Construction. 2012, 33(7): 69-72

PDF(1030 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/