1 000 kV淮上线特高压钢管塔重型构件索道运输
Cableway Transportation for Heavy Component of Steel Tube Tower in 1 000 kV UHV Transmission Line (Huainan to Shanghai)
为了解决1 000 kV淮南—上海特高压交流输变电工程施工中存在的运输难题,提出了2×多跨双索单牵引循环式索道运输方案。针对不同的荷载量,该索道运输方案分为独立运输方式、联合运输方式和拆分运输方式。试验结果表明,该索道运输方案是有效的,可为相关工程提供参考。
In order to solve the transportation difficulties in 1 000 kV UHV AC transmission engineering construction (Huainan to Shanghai), this paper put forward a transportation program of 2×multispan circulation cableway with double cable single type. According to the different load quantities, this cableway transportation program divided into independent mode, combined mode and split mode. The testing results show that the cableway transportation program is effective, which can provide reference for related projects.