500 kV海底电缆后续抛石保护工程建设

  • 王裕霜
作者信息 +

Follow-up Engineering Construction of Riprap Protection for 500 kV Submarine Cable

  • yu-shuang WANG
Author information +
文章历史 +

摘要

500 kV海南联网工程后续抛石保护工程具有施工难度大、施工设备自动化程度高、涉及技术领域广泛的特点。介绍了该工程建设前期进行的海底电缆现状调查、设计论证、试验研究,以及施工中石料的制备、工程控制等工作。工程中采用的落石管技术、水下机器人检测装置均代表了世界海洋工程技术发展水平,对国内海洋工程技术发展与工程测量装备研发具有参考意义。

Abstract

The follow-up engineering construction of riprap protection for 500 kV Hainan interconnector project has some characteristics, such as great difficulty in construction, high degree automation in construction equipment, widely involving in technology field. This paper introduced the present situation investigation, the design argument, the experimental research of submarine cable in the early period of the project, as well as the preparation of rock material and the control management in the construction process of the project. The rockfall pipe technology and remote operated vehicles adopted in the project both represent the advanced development level of ocean engineering technology in the world, which has the reference significance to the development of ocean engineering technology and the research of engineering measurement equipment in China.

引用本文

导出引用
王裕霜. 500 kV海底电缆后续抛石保护工程建设[J]. 电力建设. 2012, 33(8): 116-118
yu-shuang WANG. Follow-up Engineering Construction of Riprap Protection for 500 kV Submarine Cable[J]. Electric Power Construction. 2012, 33(8): 116-118
中图分类号: 中图分类号:TM721 文献标志码:B   

PDF(491 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/