青藏直流线路(西藏段)验收安全和技术措施

薛慧君 操松元 巴桑

电力建设 ›› 2012, Vol. 33 ›› Issue (9) : 91-93.

PDF(986 KB)
PDF(986 KB)
电力建设 ›› 2012, Vol. 33 ›› Issue (9) : 91-93.
运行与管理

青藏直流线路(西藏段)验收安全和技术措施

  • 薛慧君1,操松元1,巴桑2
作者信息 +

Safety and Technical Measures for Acceptance of Qinghai-Tibet DC Line Project (Tibet Section)

Author information +
文章历史 +

摘要

在高海拔地区进行全面登塔走线验收工作,保障验收人员安全是首要考虑内容,没有好的经验可以借鉴。以青藏直流线路西藏段验收工作为例,总结了高海拔地区线路工程验收工作的安全和技术措施,为类似工作提供参考。

Abstract

The primary consideration content was to ensure the safety of the workers in the launching full acceptance process in high elevation area, where was no good experience used for reference. Taking the Tibet section in Qinghai-Tibet DC line project as example, this article summarized the safety and technical measures for the project acceptance in high elevation area, which could provide the reference for other similar projects.

引用本文

导出引用
薛慧君 操松元 巴桑. 青藏直流线路(西藏段)验收安全和技术措施[J]. 电力建设. 2012, 33(9): 91-93
Safety and Technical Measures for Acceptance of Qinghai-Tibet DC Line Project (Tibet Section)[J]. Electric Power Construction. 2012, 33(9): 91-93

PDF(986 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/