新一代智能变电站二次设备集成方案

曹亮,陈小卫,肖筱煜

电力建设 ›› 2013, Vol. 34 ›› Issue (6) : 26-30.

PDF(641 KB)
PDF(641 KB)
电力建设 ›› 2013, Vol. 34 ›› Issue (6) : 26-30.
智能变电站专栏

新一代智能变电站二次设备集成方案

  • 曹亮1,陈小卫2,肖筱煜1
作者信息 +

Scheme for Secondary Equipments of New Generation Smart Substation

  • CAO Liang1, CHEN Xiaowei2, XIAO Xiaoyu1
Author information +
文章历史 +

摘要

详述了新一代智能变电站对二次设备的技术要求,提出在目前常见的电气主接线形式下,监控系统设备、电能计量设备、故障录波设备及同步相量测量单元(phase measurement unit, PMU)设备的集成方案,进一步探讨了监控系统的功能。按照双母线接线和3/2接线形式的继电保护配置情况分别对继电保护设备的集成方法进行了介绍,通过对监控系统、继电保护等二次设备集成方案进行比较,给出了推荐的集成方式,考虑到采样测量值(sample measured value,SMV)报文占用带宽的计算、二次设备装置背板光纤端口安装密度、屏柜空间等影响设备集成的制约因素,提出了设备集成时应重点注意的技术问题。

Abstract

The technical requirements for secondary equipments of the new generation intelligent substation is illustrated in detail, and some integration schemes are proposed for secondary equipments used in common connection forms of main electrical wiring, such as monitoring system equipments, energy metering equipments, fault recorder equipments and phase measurement unit (PMU). Then, the function of monitoring system is studied. The integration of relay protection devices is also discussed in accordance with the relay protection configuration under double-busbar and 3/2 connection form. It presents a recommended integration way based on the comparison of integration schemes of secondary equipments, such as monitoring system, relay protection and so on. Finally, the technical issues that should be focused on equipments intelligent is proposed, with considering the constraints that might affect device integration such as the occupied bandwidth of sample measured value (SMV) message (based on calculation), fiber ports density of secondary device backplane and cubicle space, etc.

关键词

智能变电站 / 二次设备 / 集成方案 / 光纤端口 / 采样测量值(SMV) / 面向通用对 象的变电站事件(GOOSE)

Key words

smart substation / secondary equipments / integration scheme / fiber port / sample measured value (SMV) / generic object oriented substation event (GOOSE)

引用本文

导出引用
曹亮,陈小卫,肖筱煜. 新一代智能变电站二次设备集成方案[J]. 电力建设. 2013, 34(6): 26-30
CAO Liang, CHEN Xiaowei, XIAO Xiaoyu. Scheme for Secondary Equipments of New Generation Smart Substation[J]. Electric Power Construction. 2013, 34(6): 26-30

参考文献

[1]丁广鑫. 智能变电站建设技术[M]. 北京:中国电力出版社,2009.


[2]殷志良,刘万顺,杨奇逊,等.基于IEC 61850的通用变电站时间模型[J].电力系统自动化,2005,29(19):45-50.

[3]国家电网公司.Q/GDW 41—2010 智能变电站继电保护技术规范[S]. 北京:国家电网公司,2011.

[4]易永辉,王雷涛,陶永健.智能变电站过程层应用技术研究[J].电力系统保护与控制,2010,38(21):1-5.

[5]刘振亚.国家电网公司输变电站工程通用设计[M]. 北京:中国电力出版社,2011.

[6]姚成,黄国方,仲雅霓,等.基于站控层GOOSE的站域控制实现方案[J].电力系统自动化,2012,36(18):159-161.

[7]范建忠,马千里.GOOSE通信与应用[J].电力系统自动化,2007,31(19):85-90.

[8]杜振华,王建勇,罗奕飞,等.基于MMS与GOOSE网合一的数字化网络保护设计[J].电力系统保护与控制,2010,38(24):178-181.

[9]柯善文,刘曙光,何能,等.关于变电站GOOSE报文传输的研究[J].继电器,2007,35(S):308-310.

[10]陈宏,黄国方,陈金猛,等. 基于IEC 61850的变电站二次系统工程调试与质量控制[J].电力建设,2012,33(9):15-19.