[1]严陆光,周孝信,张楚汉,等. 关于筹建青海大规模光伏发电与水电结合的国家综合能源基地的建议[J]. 电工电能新技术,2010,29(4):1-9.
Yan Luguang, Zhou Xiaoxin, Zhang Chuhan, et al. A proposal for planning and constructing a national integrated energy base combined with large-scale photovoltaic power and hydropower in qinghai province[J]. Advanced Technology of Electrical Engineering and Energy, 2010, 29(4): 1-9.
[2]马吉明,张楚汉,王保国. 光伏水电互补,低碳可再生能源的新途径:以青海为例[J]. 水力发电学报,2013,32(2):1-4.
Ma Jiming, Zhang Chuhan, Wang Baoguo. Hydro-photovoltaic hybrid system is a new approach to low-carbon renewable energy. A case study of Qinghai province[J]. Journal of Hydroelectric Engineering, 2013, 32(2): 1-4.
[3]龚传利,王英鑫,陈小松,等. 龙羊峡水光互补自动发电控制策略及应用[J]. 水电站机电技术,2014,37(3):63-64, 114.
Gong Chuanli, Wang Yingxin, Chen Xiaosong, et al. The automatic generation control strategy and application of Longyang Gorge Hydropower compensation photovoltaic power[J]. Mechanical & Electrical Technique of Hydropower Station,2014,37(3):63-64, 114.
[4]Yang Zilong, Wu Chunsheng, Liao Hua, et al. Research on hydro/photovoltaic hybrid generating system[C]// 2010 International Conference on Power System Technology (POWERCON), Hangzhou, 2010.
[5]静铁岩,吕泉,郭琳,等. 水电—风电系统日间联合调峰运行策略[J]. 电力系统自动化,2011,35(22):97-104.
Jing Tieyan, Lyu Quan, Guo Lin, et al. An inter-day combined operation strategy of hydro and wind power system for regulating peak load[J].Automation of Electric Power Systems,2011,35(22):97-104.
[6]孙春顺,王耀南,李欣然. 水电-风电系统联合运行研究[J]. 太阳能学报,2009,30(2):232-236.
Sun Chunshun, Wang Yaonan, Li Xinran. Study on combined operation of hydro and wind power generation system[J].Acta Energiae Solaris Sinica,2009,30(2):232-236.
[7]叶希,鲁宗相,乔颖,等. 风火联运源端系统有功优化运行分层协调思路[J]. 电力系统自动化,2014,38(20):1-8.
Ye Xi,Lu Zongxiang, Qiao Ying, et al. Hierarchical coordinated idea of wind and thermal power bundled transmission system[J].Automation of Electric Power Systems,2014,38(20):1-8.
[8]Zhang Ning, Kang Chongqing, Kirschen D S, et al. Planning pumped storage capacity for wind power integration[J]. IEEE Transactions on Sustainable Energy, 2013, 4(2): 393,401. .
[9]张曦,康重庆,张宁,等. 太阳能光伏发电的中长期随机特性分析[J]. 电力系统自动化,2014,38(6):6-13.
Zhang Xi, Kang Chongqing, Zhang Ning, et al. Analysis of mid/long term random characteristics of photovoltaic power generation[J]. Automation of Electric Power Systems,2014,38(6):6-13.
[10]赵唯嘉,张宁,康重庆,等. 光伏发电出力的条件预测误差概率分布估计方法[J]. 电力系统自动化,2015,39(16):8-15.
Zhao Weijia, Zhang Ning, Kang Chongqing, et al. A method of probabilistic distribution estimation of conditional forecast error for photovoltaic power generation[J]. Automation of Electric Power Systems,2015,39(16):8-15.
[11]张宁,周天睿,段长刚,等. 大规模风电场接入对电力系统调峰的影响[J]. 电网技术, 2010, 34(1): 152-158.
Zhang Ning, Zhou Tianrui, Duan Changgang, et al. Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J]. Power System Technology, 2010, 34(1): 152-158.
|