Rss服务   Email Alert
500 kV西郊站投产后天津西部电网解环方案分析
李文波,尹成竹,闫方,赵辰鹏,王淼
Analysis of Decoupling Loop Scheme for Tianjin Western Power Grid after Operation of 500 kV Xijiao Substation
LI Wenbo, YIN Chengzhu, YAN Fang, ZHAO Chenpeng, WANG Miao
电力建设 . 2013, (9): 26 -30 .  DOI: 10.3969/j.issn.1000-7229.2013.09.006