Rss服务   Email Alert
基于三角模糊数的风电场建设风险评价模型
程亮
Construction Risk Evacuation Model of Wind Farm Based on Triangular Fuzzy Number
CHENG Liang
电力建设 . 2014, (9): 103 -108 .  DOI: 10.3969/j.issn.1000-7229.2014.09.019