Rss服务   Email Alert
计及特高压直流输电特性的沙戈荒基地输-储协同规划方法
孙一丁, 王千辰, 谢忱峥, 郭国栋, 刘栋, 孙英云
Transmission-Storage Collaborative Planning Method for the Bases in the Gobi and Desertification Land Accounting for UHVDC Transmission Characteristics
SUN Yiding, WANG Qianchen, XIE Chenzheng, GUO Guodong, LIU Dong, SUN Yingyun
电力建设 . 2025, (3): 72 -84 .  DOI: 10.12204/j.issn.1000-7229.2025.03.006