考虑中长期水位动态调整的含混蓄电站清洁能源发电商多时间尺度滚动调度方法
钟浩, 王愈鼎, 王秋杰, 舒文倩, 陈锦华, 马佳浩
Multi-Time-Scale Rolling Scheduling of Clean Energy Producers with Hybrid Pumped-Storage Plants Considering Medium- and Long-Term Dynamic Water-Level Adjustment
ZHONG Hao, WANG Yuding, WANG Qiujie, SHU Wenqian, CHEN Jinhua, MA Jiahao
电力建设 . 2026, (11): 172 -186 .  DOI: 10.12204/j.issn.1000-7229.2026.11.013

AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?