[1]舒印彪.中国直流输电的现状及展望[J].高电压技术,2004,30(11):1-2,20.
Shu Yinbiao.Present status and prospect of HVDC transmission in China[J].High Voltage Engineering,2004,30(11):1-2,20.
[2]刘振亚,张启平.国家电网发展模式研究[J]. 中国电机工程学报,2013,33(7):1-10.
Liu Zhenya,Zhang Qiping.Study on the development mode of national power gird of China[J].Power System Technology,2013,33(7):1-10.
[3]舒印彪,刘泽洪,袁竣,等.2005 年国家电网公司特高压输电论证综述[J].电网技术,2006,30(5):1-12.
Shu Yinbiao,Liu Zehong,Yuan Jun,et al.A survey on demonstration of UHV power transmission by State Grid Corporation of China in the year of 2005[J].Power System Technology,2006,30(5):1-12.
[4]杨万开,印永华,曾南超,等. 天中特高压直流输电工程系统试验方案[J]. 电网技术, 2015, 39(2): 349-355.
Yang Wankai, Yin Yonghua, Zeng Nanchao, et al. System commissioning test program of ±800 kV UHVDC transmission project from Tianshan to Zhongzhou[J]. Power System Technology,2015, 39(2): 349-355.
[5]袁清云.特高压直流输电技术现状及在我国的应用前景[J].电网技术,2005,29(14):1-3.
Yuan Qingyun.Present state and application prospect of ultra HVDC transmission in China[J].Power System Technology,2005,29(14):1-3.
[6]梁旭明,张平,常勇.高压直流输电技术现状及发展前景[J].电网技术,2012,36(4):1-9.
Liang Xuming,Zhang Ping,Chang Yong.Recent advances in high voltage direct-current power tansmission and its developing potential[J].Power System Technology,2012,36(4):1-9.
[7]钟胜, 郭相国,田昕,等.哈密至郑州特高压直流对受端电网影响分析[J].中国电力,2012,45(11):47-51.
Zhong Sheng, Guo Xiangguo, Tian Xin, et al. Influences of the UHVDC project from hami to Zhengzhou on central China power grid[J].Electric Power,2012,45(11):47-51.
[8]关洪浩, 张锋,孙谊媊,等.哈郑直流工程投运初期对新疆电网影响分析[J].中国电力,2012,45(12):48-51.
Guan Honghao, Zhang Feng, Sun Yiqian, et al.Analysis on the impact of Hami-Zhengzhou ultra-high voltage DC project on the power grid[J].Electric Power,2012,45(12):48-51.
[9]徐攀腾, 宋述波,张志朝.特高压直流控制保护系统参数对零功率试验影响分析[J].中国电力,2013,46(6):34-37.
Xu Panteng, Song Shubo, Zhang Zhichao. Analysis of the effects of the control and protection system parameters on zero-load test in Yunnan-Guangdong UHVDC transmission project[J].Electric Power,2013,46(6):34-37.
[10]马为民,高理迎, 李亚男,等.特高压直流输电系统可靠性和可用率研究[J].中国电力,2007,40(12):14-18.
Ma Weimin, Gao Liying, LI Yanan, et al. Study on reliability and availability of a UHVDC transmission system[J].Electric Power,2007,40(12):14-18.
[11]刘振亚,舒印彪,张文亮,等. 直流输电系统电压等级序列研究[J]. 中国电机工程学报, 2008, 28(10): 1-8.
Liu Zhenya,Shu Yinbiao,Zhang Wenliang,et al. Study on voltage class series for HVDC transmission system[J]. Proceeding of the CSEE, 2008, 28(10): 1-8.
[12]王森,周晓宇,吴宁,等. 特高压中州换流站保护三取二逻辑优化分析[J]. 电力建设, 2015, 36(2): 104-109.
Wang Sen,Zhou Xiaoyu,Wu Ning,et al. Optimization analysis for two-out-of-three logic of DC protection in UHV Zhongzhou converter station[J]. Electric Power Construction, 2015, 36(2): 104-109.
[13]黎建平, 汪凤娇, 卢文浩,等. 特高压直流保护与避雷器动作特性配合分析[J]. 电力建设, 2014, 35(12): 100-105.
Li Jianping, Wang Fengjiao, Lu Wenhao,et al. Coordination of UHVDC protection with arresters operating characteristics[J]. Electric Power Construction, 2014, 35(12): 100-105.
[14]李扬. 楚穗直流输电系统双阀组闭锁事件及保护动作行为分析[J]. 电力建设, 2014, 35(1): 57-61.
Li Yang. Double valve group blocking fault and protection action analysis of Chusui UHVDC power transmission system[J]. Electric Power Construction, 2014, 35(1): 57-61.
[15]浙江大学直流输电科研组.直流输电[M].北京: 电力工业出版社,1982:58-86.
[16]赵畹君.高压直流输电工程技术[M].北京:中国电力出版社,2004:33-56.
[17]刘耀,王明新, 曾南超. 高压直流输电保护装置冗余配置可靠性分析(续)[J]. 电网技术, 2010, 34(11): 93-99.
Liu Yao,Wang Mingxin,Zeng Nanchao. Reliability analysis on redundant configuration of HVDC protection[J]. Power System Technology, 2010, 34(11): 93-99.
[18]梁旭明,吴巾克,冀肖彤.国家电网公司直流输电工程控制保护系统运行情况分析[J].电网技术,2005,29(23):7-17.
Liang Xuming,Wu Jinke,Ji Xiaotong.Operating performance analysis on control and protection system of SGCC’s HVDC projects [J].Power System Technology,2005,29(23):7-17.
[19]吴萍,林伟芳,孙华东,等.多馈入直流输电系统换相失败机制及特性研究[J].电网技术,2012,36(5):269-274.
Wu Ping,Lin Weifang,Sun Huadong,et al.Research and electromechanical transient simulation on mechanism of commutation failure in multi-infeed HVDC power transmission system[J].Power System Technology,2012,36(5):269-274. |