[1]刘振亚.特高压电网[M].北京:中国经济出版社,2005:159-166.
[2]覃琴, 郭强, 周勤勇, 等. 国网“十三五”规划电网面临的安全稳定问题及对策[J]. 中国电力, 2015, 48(1): 25-32.
Qin Qin,Guo Qiang,Zhou Qinyong,et al. The security and stability of power grids in 13th Five—Year Planning and Countermeasures[J]. Electric Power, 2015, 48(1): 25-32.
[3]国家电网公司. 国家电网公司“十二五”电网发展规划[R]. 北京: 国家电网公司, 2012.
[4]刘振亚, 张启平. 国家电网发展模式研究[J].中国电机工程学报, 2013, 33(7):1-10.
Liu Zhenya, Zhang Qiping. Study on the development mode of national power grid of China[J]. Proceedings of the CSEE, 2013, 33(7):1-10.
[5]田芳,黄彦浩,史东宇,等. 电力系统仿真分析技术的发展趋势[J]. 中国电机工程学报, 2014,34(13):2151-2163.
Tian Fang,Huang Yanhao,Shi Dongyu,et al. Developing trend of power system simulation and analysis technology[J]. Proceedings of the CSEE, 2014,34(13):2151-2163.
[6]汤涌. 电力系统数字仿真技术的现状与发展[J]. 电力系统自动化,2002,26(17):66-70.
Tang Yong. Present situation and development of power system simulation technologies[J]. Automation of Electric Power Systems,2002, 26(17):66-70.
[7]刘文焯,汤涌,万磊,等. 大电网特高压直流系统建模与仿真技术[J]. 电网技术,2008,32(22):1-3,7.
Liu Wenzhuo,Tang Yong, Wan Lei, et al. Modeling and simulation technologies for large UHVDC power grid[J]. Power System Technology, 2008, 32(22):1-3,7.
[8]万磊,丁辉,刘文焯. 基于实际工程的直流输电控制系统仿真模型[J]. 电网技术,2013,37(3):629-634.
Wan Lei, Ding Hui, Liu Wenzhuo. Simulation model of control system for HVDC power transmission based on actual project[J]. Power System Technology, 2013,37(3):629-634.
[9]中国电力科学研究院. 电力系统分析综合程序7.1版用户手册[M].北京:中国电力科学研究院,2015.
[10]汤涌,卜广全,印永华,等.PSD-BPA 暂态稳定程序用户手册[M].北京:中国电力科学研究院,2008.
[11]Manitoba HVDC Research Centre.PSCAD user guide[R].Winnipeg,Manitoba,Canada:Manitoba HVDC Research Centre,2003.
[12]Power technologies INC.PSS/E program application guide (PAG)[R].Schenectady:Power Technologies INC,2004.
[13]鞠平,谢会玲,陈谦.电力负荷建模研究的发展趋势[J].电力系统自动化,2007, 31(2):1-4,64.
Ju Ping, Xie Huiling, Chen Qian. Research tendencies of electric load modeling[J]. Automation of Electric Power Systems, 2007, 31(2): 1-4,64.
[14]汤涌,张东霞,张红斌,等.东北电网大扰动试验仿真计算中的综合负荷模型及其拟合参数[J].电网技术,2007, 31(4):75-78.
Tang Yong, Zhang Dongxia, Zhang Hongbin, et al. Synthesis load model and its fitting parameters in simulation of large disturbance test carried out in Northeast China power grid[J]. Power System Technology, 2007, 31(4): 75-78.
[15]汤涌,张红斌,侯俊贤,等.考虑配电网络的综合负荷模型[J].电网技术,2007, 31(5):34-38.
Tang Yong, Zhang Hongbin, Hou Junxian, et al. A synthesis load model with distribution network[J]. Power System Technology, 2007, 31(5): 34-38.
[16]DL/T 755—2001 电力系统安全稳定导则[S].
[17]汤涌.交直流电力系统多时间尺度全过程仿真和建模研究新进展[J].电网技术,2009,33(16):1-8.
Tang Yong.New progress in research on multi-time scale unified simulation and modeling for AC/DC power systems[J].Power System Technology,2009,33(16):1-8.
[18]王成山,李鹏,王立伟.电力系统电磁暂态仿真算法研究进展[J]. 电力系统自动化,2009,33(7):97-103.
Wang Chengshan, Li Peng, Wang Liwei. Progresses on algorithm of electromagnetic transient simulation for electric power system [J].Automation of Electric Power Systems, 2009,33(7):97-103.
[19]穆清,周孝信,王祥旭,等.面向实时仿真的小步长开关误差分析和参数设置[J].中国电机工程学报,2013,33(31):120-129.
Mu Qing, Zhou Xiaoxin, Wang Xiangxu, et al. Error analysis and parameters of switches in small step simulation for real-time simulation[J]. Proceedings of the CSEE, 2013,33(31): 120-129.
[20]穆清,李亚楼,周孝信,等.基于传输线分网的并行多速率电磁暂态仿真算法[J].电力系统自动化,2014,38(7):47-52.
Mu Qing, Li Yalou, Zhou Xiaoxin, et al. A parallel multi-rate electromagnetic transient simulation algorithm based on network division through transmission line[J]. Automation of Electric Power Systems, 2014,38(7): 47-52.
[21]汤涌.电力系统全过程动态(机电暂态与中长期动态过程)仿真技术与软件研究[D].北京:中国电力科学研究院,2002.
Tang Yong. The studies on techniques and software of power system full dynamic(electric-mechemical transient mid-term and long-term dynamic) simulation[D]. Beijing: China Electric Power Research Institute, 2002.
[22]朱旭凯,周孝信,田芳,等. 基于电力系统全数字实时仿真装置的大电网机电暂态–电磁暂态混合仿真[J]. 电网技术,2011,35(3):26-31.
Zhu Xukai, Zhou Xiaoxin, Tian Fang, et al. Hybrid electromechanical-electromagnetic simulation to transient process of large-scale power grid on the basis of ADPSS[J]. Power System Technology, 2011,35(3):26-31.
[23]岳程燕,田芳,周孝信,等.电力系统电磁暂态-机电暂态混合仿真接口原理[J].电网技术,2006, 30(1):23-27,88.
Yue Chengyan, Tian Fang, Zhou Xiaoxin, et al. Principle of interfaces for hybrid simulation of power system electromagnetic-electromechanical transient process[J]. Power System Technology, 2006, 30(1): 23-27,88.
[24]郭琦,曾勇刚,李伟,等.交直流大电网混合实时仿真(SMRT)平台研发与工程应用[J].南方电网技术,2015,9(1):33-38.
Guo Qi, Zeng Yonggang, Li Wei, et al. Development and engineering application of super mixed real-time simulation (SMRT) platform for AC-DC hybrid bulk power systems[J]. Southern Power System Technology, 2015, 9(1): 33-38.
[25]李亚楼,周孝信,吴中习.基于PC机群的电力系统机电暂态仿真并行算法[J].电网技术,2003, 27(11):6-12.
Li Yalou, Zhou Xiaoxin, Wu Zhongxi. Personal computer cluster based parallel algorithms for power system electromechanical transient stability simulation[J]. Power System Technology, 2003, 27(11): 6-12.
[26]岳程燕,周孝信,李若梅.电力系统电磁暂态实时仿真中并行算法的研究[J].中国电机工程学报,2004, 24(12):1-7.
Yue Chengyan, Zhou Xiaoxin, Li Remei. Study of parallel approaches to power system electromagnetic transient real-time simulation[J]. Proceedings of the CSEE, 2004, 24(12): 1-7.
[27]田芳,周孝信.交直流电力系统分割并行电磁暂态数字仿真方法[J].中国电机工程学报,2011, 31(22):1-7.
Tian Fang, Zhou Xiaoxin. Partition and parallel method for digital electromagnetic transient simulation of AC/DC power system[J]. Proceedings of the CSEE, 2011, 31(22): 1-7.
[28]叶林,杨仁刚,杨明皓,等.电力系统实时数字仿真器RTDS[J].电工技术杂志,2004(7):49-52.
Ye Lin, Yang Rengang, Yang Minghao, et al. Real time digital simulator and its applications[J]. Electrotechnical Journal, 2004(7): 49-52.
[29]周保荣,房大中,Snider Laurence A,等.全数字实时仿真器:HYPERSIM[J].电力系统自动化,2003, 27(19):79-82.
Zhou Baorong, Fang Dazhong, Snider Laurence A, et al. The fully digital real-time simulator:Hypersim[J]. Automation of Electric Power Systems, 2003, 27(19): 79-82.
[30]周林,贾芳成,郭珂.采用RT-LAB的光伏发电仿真系统试验分析[J].高电压技术,2010,36(11):2814-2820.
Zhou Lin, Jia Fangcheng, Guo ke, et al. Testing analysis on a kind of PV generation simulation system using RT-LAB[J]. High Voltage Engineering, 2010, 36(11): 2814-2820.
[31]田芳,李亚楼,周孝信,等. 电力系统全数字实时仿真装置[J]. 电网技术,2008,32(22):17-22.
Tian Fang,Li Yalou,Zhou Xiaoxin,et al. Advanced digital power system simulator[J]. Power System Technology, 2008, 32(22):17-22.
[32]郑三立,黄梅,张海红.电力系统数模混合实时仿真技术的现状与发展[J].现代电力,2004, 21(6):29-33.
Zheng Sanli, Huang Mei, Zhang Haihong. Present situation and development of hybrid real-time simulator for power systems[J]. Modern Electric Power, 2004, 21(6): 29-33.
[33]胡涛,朱艺颖,张星,等. 全数字实时仿真装置与物理仿真装置的功率连接技术[J]. 电网技术, 2009, 34(1):51-55.
Hu Tao, Zhu Yiying, Zhang Xing, et al. A brief introduction to power connection technology for full-digital real—time simulator and analogue simulator[J]. Power System Technology, 2009, 34(1):51-55
[34]董鹏,朱艺颖,呙虎,等.特高压电网建设初期“三华”电网数模混合实时仿真试验研究[J].电网技术,2012, 36(1):18-25.
Dong Peng, Zhu Yiying, Guo Hu, et al. Digital-analog hybrid real-time simulation for primary stage of North China-Central China-East China UHV power grid[J]. Power System Technology, 2012, 36(1): 18-25.
|