特高压GIS现场安装用全封闭移动式厂房导轨基础设计与施工

刘建楠1,阎国增1,倪向萍1,卞秀杰1,朱海维2,付宝良1,张尔乐1   

  1. 1.国家电网公司交流建设分公司,北京市 100052;2.华东电力设计院,上海市 200063
  • 出版日期:2015-02-01
  • 作者简介:刘建楠(1986),男,工学硕士,工程师,主要从事输变电工程建设管理和施工技术工作; 阎国增(1970),男,工学硕士,高级工程师,主要从事输变电工程建设管理和施工技术工作; 倪向萍(1981),女,工学博士,高级工程师,主要从事输变电工程建设管理和施工技术工作; 卞秀杰(1988),男,工学硕士,工程师,主要从事输变电工程建设管理和施工技术工作; 朱海维(1983),男,工学硕士,工程师,主要从事变电站结构设计工作; 付宝良(1977),男,工学学士,工程师,主要从事输变电工程建设管理和施工技术工作; 张尔乐(1981),男,工学学士,工程师,主要从事输变电工程建设管理和施工技术工作。
  • 基金资助:
    国家电网公司科技项目(特高压GIS现场安装用全封闭移动式厂房技术研究)。

Design and Construction of Track Foundation of Totally-Enclosed Self-Assembly Building for UHV GIS Field Installation

LIU Jiannan1,YAN Guozeng1,NI Xiangping1,BIAN Xiujie1,ZHU Haiwei2,FU Baoliang1,ZHANG Erle1   

  1. 1. State Grid AC Engineering Construction Co., Beijing 100052, China;2. East China Electric Design Institute, Shanghai 200063, China
  • Online:2015-02-01

摘要: 1 000 kV气体绝缘金属封闭开关(gas insulated metal-enclosed switchgear,GIS)设备的安装是特 高压交流变电站工程施工过程中的关键工序。为保证1 000 kV GIS设备的安装条件,同时为施工人员提供舒适 的工作环境,国网交流公司积极组织研制了特高压GIS现场安装用全封闭移动式厂房,并在浙北—福州特高压交 流输变电工程中的3个新建变电站工程中全线推广。对移动厂房的总体情况进行了介绍,重点研究了移动厂房的 导轨基础设计,结合移动厂房在浙北—福州工程现场的实际应用情况,从厂房导轨基础形式的选择、设置位置 确定以及导轨基础对原有设备基础施工的影响等方面进行了介绍和分析。

关键词: 1 000 kV GIS, 移动式厂房, 气体绝缘金属封闭开关(GIS)设备安装, 导轨基础, 基础设计, 条形基础

Abstract: The installation of 1 000 kV gas insulated metal-enclosed switchgear (GIS) is a very important process in the construction of UHV AC substation project. In order to ensure the conditions for UHV GIS installation and provide comfortable working environment for workers, the State Grid AC Engineering Construction Company actively developed a totally-enclosed self- assembly building for UHV GIS installation, which had been widely applied in three new-built substation projects of Zhebei-Fuzhou UHV AC power transmission project. This paper gave a general introduction of self-assembly building and mainly studied the design of track foundation for self-assembly building. Based on the actual application effect of self-assembly building in Zhebei-Fuzhou project, this paper introduced and analyzed the selection of the form and located position of self-assembly building track foundation, as well as the influence of self-assembly building track foundation on the construction of nearby equipment foundations.

Key words: 1 000 kV GIS, self-assembly building, GIS installation, track foundation, foundation design, strip foundation