电网建设项目投资优化管理方法与应用

郑琳

电力建设 ›› 2011, Vol. 32 ›› Issue (1) : 104-107.

PDF(714 KB)
PDF(714 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (1) : 104-107.
运行与管理

电网建设项目投资优化管理方法与应用

  • 郑琳
作者信息 +

Optimal Management Method and Its Application in Grid Project Portfolio

Author information +
文章历史 +

摘要

基于投资优化管理理念和流程分析,对电网建设项目投资优化管理方法与应用进行了研究。以项目投资组合收益最大化为目标,综合考虑了电网建设的经济性、可靠性、社会性要求,将资金总额约束条件转化为罚函数计入目标函数,构建了项目投资组合优化模型。通过算例分析,验证了模型的实用性以及遗传算法求解的准确性。

Abstract

Based on the investment optimal theory and process analysis, the management method and its application in investment optimization for grid projects are studied. With comprehensive considerations of economy, reliability, sociality, the optimal model of grid project portfolio is constructed which transforms the capital constraints into a penalty function and takes achieving the maximum profits as its target. The model and genetic algorithm are proved practical and correct through calculation examples.

引用本文

导出引用
郑琳. 电网建设项目投资优化管理方法与应用[J]. 电力建设. 2011, 32(1): 104-107
Optimal Management Method and Its Application in Grid Project Portfolio[J]. Electric Power Construction. 2011, 32(1): 104-107

基金

国家自然科学基金


PDF(714 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/