500/220 kV四回路SSZT1悬垂塔真型试验及分析

葛保斌 边冯博 朱杨春 董建尧

电力建设 ›› 2011, Vol. 32 ›› Issue (12) : 28-32.

PDF(1974 KB)
PDF(1974 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (12) : 28-32.
输配电技术

500/220 kV四回路SSZT1悬垂塔真型试验及分析

  • 葛保斌1,边冯博1,朱杨春2,董建尧3
作者信息 +

Prototype Model Test and Analysis of 500/220 kV SSZT1 Transmission Tower

Author information +
文章历史 +

摘要

为确保国电谏壁发电厂(送出)500 kV输电线路安全、可靠地运行以及验证杆塔设计的合理性,选择工程中使用量最大的SSZT1悬垂塔进行杆塔真型试验。在第7工况和第18工况试验中,部分杆件发生屈曲,显示实际结构受力与计算模型存在差异。针对试验过程中出现的问题进行了讨论,分析了问题出现的原因,提出了处理方案,为今后的铁塔设计及试验提供了参考。

Abstract

For the safety and stability of the 500 kV transmission line, SSZT1 angle tower which is widely used in the transmission project has been chosen for the prototype model test. In No.7 and No.18 load cases, bending occurs showing force differences between the real structure and the computational model. Aiming at the problems, the reasons for bending and solutions are introduced which could also be used as references for other tower design and tests.

关键词

悬垂塔真型塔试验 / 屈曲 / 双拼主材

引用本文

导出引用
葛保斌 边冯博 朱杨春 董建尧. 500/220 kV四回路SSZT1悬垂塔真型试验及分析[J]. 电力建设. 2011, 32(12): 28-32
Prototype Model Test and Analysis of 500/220 kV SSZT1 Transmission Tower[J]. Electric Power Construction. 2011, 32(12): 28-32

PDF(1974 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/