火电厂SCR烟气脱硝反应器前设置灰斗及增加烟道截面的探讨

孙叶柱 王义兵 梁学东 陈丰 郑建农

电力建设 ›› 2011, Vol. 32 ›› Issue (12) : 64-68.

PDF(1604 KB)
PDF(1604 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (12) : 64-68.
发电技术

火电厂SCR烟气脱硝反应器前设置灰斗及增加烟道截面的探讨

  • 孙叶柱1,王义兵1,梁学东2,陈丰1,郑建农1
作者信息 +

Research and Discussion on Design of Ash Hopper and Flue of SCR for Coal-fired Power Plant

Author information +
文章历史 +

摘要

阐述了飞灰对火电厂脱硝催化剂的磨损和堵塞机理。通过分析国内燃煤电厂飞灰的特性,说明飞灰对催化剂的磨损作用是较强的。探讨了通过在选择性催化还原烟气脱硝反应器前设置灰斗和增加烟道截面的方式,来提高大颗粒飞灰的去除效率,有效减少飞灰对催化剂的磨损和阻塞,延长催化剂寿命的可行性。

Abstract

The effects of ash on the abrasion and blocking of DeNitration Catalysts are introduced in coalfired power plant. It is shown that the ash abrasion on the catalyst is powerful based on analyzing the ash characteristics. In order to get rid of the coarse ash particle, reduce the abrasion and blocking on the catalyst, and prolong the catalyst service life, it is proposed to install the ash hopper and enlarge the flue section before SCR(selective catalytic reduction).

关键词

选择性催化还原烟气脱硝 / 催化剂 / 飞灰 / 磨损 / 堵塞 / 灰斗 / 烟道 / 扩容

引用本文

导出引用
孙叶柱 王义兵 梁学东 陈丰 郑建农. 火电厂SCR烟气脱硝反应器前设置灰斗及增加烟道截面的探讨[J]. 电力建设. 2011, 32(12): 64-68