1 000 MW超超临界锅炉冲管临时管设计探讨

单宏威 张丹 王学关

电力建设 ›› 2011, Vol. 32 ›› Issue (6) : 114-117.

PDF(687 KB)
PDF(687 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (6) : 114-117.
施工技术

1 000 MW超超临界锅炉冲管临时管设计探讨

  • 单宏威,张丹,王学关
作者信息 +

Design of Temporary Flushing Piping for 1 000 MW Ultra Super-critical Boiler

Author information +
文章历史 +

摘要

介绍华能汕头海门电厂1号1 000 MW超超临界机组锅炉冲管临时管的设计;对设计中需要考虑的热应力、补偿性能、热膨胀等因素进行探讨,为同类型燃煤/气机组临冲管的设计提供参考。

Abstract

In the paper,the design of the temporary flushing pipes for 1 000 MW ultra super-critical unit boiler in Huaneng Shantou Haimen Power Plant is introduced.The impact factors considered for the design,such as thermal stress,performance compensation and thermal expansion etc.,are discussed,providing reference for similar design of coal or gas fired units.

关键词

1 000 MW机组 / 锅炉冲管 / 临冲管 / 热膨胀 / 高压进汽吹扫 / 支吊架

引用本文

导出引用
单宏威 张丹 王学关. 1 000 MW超超临界锅炉冲管临时管设计探讨[J]. 电力建设. 2011, 32(6): 114-117
Design of Temporary Flushing Piping for 1 000 MW Ultra Super-critical Boiler[J]. Electric Power Construction. 2011, 32(6): 114-117