1 000 kV交流特高压双柱组合耐张塔软跳线电气试验

潘少成 张要强 胡选 王予平

电力建设 ›› 2011, Vol. 32 ›› Issue (6) : 26-29.

PDF(1262 KB)
PDF(1262 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (6) : 26-29.
输配电技术

1 000 kV交流特高压双柱组合耐张塔软跳线电气试验

  • 潘少成1,张要强1,胡选2,王予平1
作者信息 +

Electrical Test of Flexible Jumper in Double-pole-composite Strain Tower of 1 000 kV AC Ultra High Voltage

Author information +
文章历史 +

摘要

以1 000 kV特高压双柱组合耐张塔应用研究项目为依托,介绍了双柱组合耐张塔软跳线系统的电气试验方案,并对试验结果进行了分析。结果表明:软跳线系统的电气性能能够满足工程要求。

Abstract

Based on the project of application and investigation of double-pole-composite strain tower of 1 000 kV ultra high voltage,the electrical test program of flexible jumper system in double-pole-composite strain tower is introduced.By the analysis of test result,it is shown that the electrical properties of the flexible jumper system can meet the engineering requirements. KEYWORDS:ultra high voltage;double-pole-composite strain tower;flexible jumper;electrical test;corona; radio interference

关键词

特高压 / 双柱组合耐张塔 / 软跳线 / 电气试验 / 电晕 / 无线电干扰

引用本文

导出引用
潘少成 张要强 胡选 王予平. 1 000 kV交流特高压双柱组合耐张塔软跳线电气试验[J]. 电力建设. 2011, 32(6): 26-29
Electrical Test of Flexible Jumper in Double-pole-composite Strain Tower of 1 000 kV AC Ultra High Voltage[J]. Electric Power Construction. 2011, 32(6): 26-29

基金

国家电网工程项目(1000kV淮南-上海特高压同塔双回输电工程)