云广特高压直流一起双极三阀组相继闭锁分析

邵震 袁鹏 林睿

电力建设 ›› 2011, Vol. 32 ›› Issue (6) : 30-34.

PDF(1831 KB)
PDF(1831 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (6) : 30-34.
输配电技术

云广特高压直流一起双极三阀组相继闭锁分析

  • 邵震1,袁鹏2,林睿2
作者信息 +

Analysis of Successive Blocks of Bipolar Three Valves Manifold in Yunnan-Guangdong UHVDC System

Author information +
文章历史 +

摘要

以云广特高压直流系统1起双极三阀组相继闭锁事故为基础,分析了事故发生经过和原因,介绍了云广特高压直流系统测量系统,对云广特高压直流测量系统遭受干扰的原因进行了深入分析,并通过仿真与实验证明了干扰的存在。根据仿真和试验结果,以及穗东换流站二次设备抗干扰存在的问题,提出了相应的改进措施。

Abstract

The successive blocks of bipolar three valves manifold occur in Yunnan-Guangdong UHVDC system.In this paper,the process of the accident are analyzed and the electromagnetic interference of measuring system analyzed.It is proved that the electromagnetic interference exists in the secondary devices of Suidong convertor station and the improvement measures are suggested by the simulation and experimental results.

关键词

特高压直流输电 / 双极闭锁 / 电磁干扰 / 直流保护 / 测量装置

引用本文

导出引用
邵震 袁鹏 林睿. 云广特高压直流一起双极三阀组相继闭锁分析[J]. 电力建设. 2011, 32(6): 30-34
Analysis of Successive Blocks of Bipolar Three Valves Manifold in Yunnan-Guangdong UHVDC System[J]. Electric Power Construction. 2011, 32(6): 30-34

PDF(1831 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/