基于1 036 MW机组汽轮机驱动式引风机性能分析

孙伟鹏 冯庭有

电力建设 ›› 2011, Vol. 32 ›› Issue (7) : 87-91.

PDF(1261 KB)
PDF(1261 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (7) : 87-91.
发电技术

基于1 036 MW机组汽轮机驱动式引风机性能分析

  • 孙伟鹏,冯庭有
作者信息 +

Performance Analysis of Induced Draft Fan Driven by Turbine in 1 036 MW Units

  • ,TingYou FENG
Author information +
文章历史 +

摘要

随着节能降耗的深入推进,某电厂3号、4号机组在引风机、脱硫增压风机合并后的基础上,采用汽轮机代替电动机驱动引风机。对炉膛负压控制策略、特殊管路配置、风机并列实验、异常工况分析等进行分析探讨,证明汽轮机驱动式引风机的创新型设计、可控性试验成果。研究成果对大型电厂辅机选型、调试、运行、改造等多方面都具有较大的参考价值。

Abstract

With further promotion of energy saving, the induced draft fan merges with the desulfurization booster fan in No.3 and 4 units of a power plant, and the fan is driven by turbine instead of the electric motor. The control strategy of furnace draft, special plumbing configuration, parallel tests for fans and abnormal condition analysis are discussed in this paper, proving that the fan driven by turbine is innovative and controllable. It provides references and is worth while popularizing its application from the type selection, debugging, running and refomation of auxiliary engines in large-scale power plant.

关键词

1 036 MW机组 / 汽轮机驱动 / 并列运行 / 性能分析 / 控制策略

Key words

1 036 MW units / driven by turbine / parallel operation / performance analysis / control strategy

引用本文

导出引用
孙伟鹏 冯庭有. 基于1 036 MW机组汽轮机驱动式引风机性能分析[J]. 电力建设. 2011, 32(7): 87-91
TingYou FENG. Performance Analysis of Induced Draft Fan Driven by Turbine in 1 036 MW Units[J]. Electric Power Construction. 2011, 32(7): 87-91