斜坡地形输电线路基础和杆塔的配合技术

鲁先龙 程永锋

电力建设 ›› 2011, Vol. 32 ›› Issue (8) : 29-33.

PDF(849 KB)
PDF(849 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (8) : 29-33.
输配电技术

斜坡地形输电线路基础和杆塔的配合技术

  • 鲁先龙,程永锋
作者信息 +

Study on Technology of Foundation to Match Tower Structure of Transmission Line on Sloping Ground

  • Xian-Long LU,
Author information +
文章历史 +

摘要

提出了4种斜坡地形输电线路基础和杆塔结构的配合方案:铁塔等长腿配等高基础、铁塔等长腿配深浅基础、铁塔长短腿配等高基础、全方位铁塔长短腿配高低主柱基础,给出了斜坡地形输电线路基础与杆塔结构强度配合以及连接方式确定的原则,阐述了采用有效抗拔深度量化斜坡地形对基础承载力降低、临坡基础破坏模式的方法。

Abstract

According to characteristics of tower foundation on sloping groud, four kind of solutions are proposed to match up between the base and the tower structure of transmission line. The four proposals are introduced respectively as, equal tower leg length with equal foundation, equal tower leg length with unequal embedded foundation, unequal tower leg length with equal foundation, and unequal tower leg length with unequal foundation. The match up principles are also given. The effective uplift resistance depth was supposed to reflect the bearing capacity of foundations on sloping ground.

关键词

斜坡地形 / 输电线路 / 杆塔基础 / 杆塔结构 / 有效抗拔深度 / 破坏模式

引用本文

导出引用
鲁先龙 程永锋. 斜坡地形输电线路基础和杆塔的配合技术[J]. 电力建设. 2011, 32(8): 29-33
Xian-Long LU. Study on Technology of Foundation to Match Tower Structure of Transmission Line on Sloping Ground[J]. Electric Power Construction. 2011, 32(8): 29-33

PDF(849 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/