1 000 MW机组电气主接线方案研究
Programs of the Main Electrical Connection Study of 1 000 MW Generators
根据平顶山第二发电厂的建设规模、接入系统条件、电气主接线要求等,提出一期工程4种电气主接线方案,并从技术、经济上进行分析论证。通过对各方案的技术经济比较,推荐工程采用一个半断路器接线方案。
Based on the construct proportion,system accessing conditions and the main electrical connection requirements of the second power station in Pingdingshan,the paper proposes 4 main electrical connection programs of the first stage project. By comparing from the technology aspect and the economy aspect,the paper recommends that the project uses one and a half circuit breakers connection program.
1 000 MW机组 / 电气主接线 / 一个半断路器接线 / 启动/备用电源 / 出口断路器