220 kV同塔双回线路钻越500 kV线路的方案选择

宋岩 王炜 王辉 郭志涛

电力建设 ›› 2012, Vol. 33 ›› Issue (10) : 89-93.

PDF(1517 KB)
PDF(1517 KB)
电力建设 ›› 2012, Vol. 33 ›› Issue (10) : 89-93.
施工技术

220 kV同塔双回线路钻越500 kV线路的方案选择

  • 宋岩,王炜,王辉,郭志涛
作者信息 +

Scheme Selection of 220 kV Double-circuit Transmission Line Undercrossing 500 kV Transmission Line

Author information +
文章历史 +

摘要

针对220 kV同塔双回线路钻越500 kV线路的方案选择问题,分析了钻越方案的制约因素,采用改变地线悬挂形式、导线排列方式、跳线绝缘子串型式等措施,进行了钻越塔的设计和优化,设计了双回鹰嘴蝶型耐张塔。经工程实际应用证明,该型耐张塔具有良好的推广前景,为220 kV同塔双回线路钻越500 kV线路提供了一种可行的解决方案。

Abstract

According to the scheme selection of 220 kV double-circuit transmission lines undercrossing 500 kV transmission lines, this paper analyzed the restricting factors of undercrossing scheme. Some measures were suggested such as changing suspension form of ground wire, arrangement mode of conductors and insulator string type of jumper wires. Finally, this paper designed and optimized the undercrossing tower, and proposed a double-circuit tension tower with olecranon-butterfly type. The engineering practical application proves that this tension tower has a good promotion prospect, and can provide a feasible solution for 220 kV double-circuit transmission lines undercrossing 500 kV transmission lines.

引用本文

导出引用
宋岩 王炜 王辉 郭志涛. 220 kV同塔双回线路钻越500 kV线路的方案选择[J]. 电力建设. 2012, 33(10): 89-93
Scheme Selection of 220 kV Double-circuit Transmission Line Undercrossing 500 kV Transmission Line[J]. Electric Power Construction. 2012, 33(10): 89-93

PDF(1517 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/