超高压输电线路耐张塔45°风荷载的计算与分析

王新宇 施菁华 曹玉杰 张耀民 杜国良

电力建设 ›› 2012, Vol. 33 ›› Issue (12) : 23-26.

PDF(741 KB)
PDF(741 KB)
电力建设 ›› 2012, Vol. 33 ›› Issue (12) : 23-26.
规划设计

超高压输电线路耐张塔45°风荷载的计算与分析

  • 王新宇,施菁华,曹玉杰,张耀民,杜国良
作者信息 +

Design and Application of Dredged Foundation for Transmission Tower in Xinjiang Gobi Area

Author information +
文章历史 +

摘要

以500 kV承德—平安城双回输电线路工程和±660 kV宁东—山东直流输电线路工程为例,对耐张塔45°风荷载进行了计算,并与其他角度的风荷载进行了比较。分析了各种塔型在计入45°风荷载作用后,相对90°风荷载工况下铁塔塔腿内力的增加量以及对塔体质量的影响,提出了在超高压线路耐张塔设计中把45°风荷载作为非必要工况来进行考虑的建议。

Abstract

Taking Chengde-Pingancheng 500 kV double-circuit line project and Ningdong-Shandong ±660kV DC power transmission line project as examples, in this paper, the 45° wind load on tension towers is calculated and the wind loads in different angles are compared. The internal force increase of tower legs and the influence on tower weight under 45° wind conditions are also analyzed, based on the comparison with 90° wind conditions. It was suggested that 45° wind should be considered as unnecessary condition for the design of tension tower of EHV transmission lines.

关键词

45° / 风荷载

Key words

45° / wind load

引用本文

导出引用
王新宇 施菁华 曹玉杰 张耀民 杜国良. 超高压输电线路耐张塔45°风荷载的计算与分析[J]. 电力建设. 2012, 33(12): 23-26
Design and Application of Dredged Foundation for Transmission Tower in Xinjiang Gobi Area[J]. Electric Power Construction. 2012, 33(12): 23-26
中图分类号: TM 753   

PDF(741 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/