印度火电厂的主要热力系统及主要设备

郑赟

电力建设 ›› 2012, Vol. 33 ›› Issue (3) : 79-82.

PDF(564 KB)
PDF(564 KB)
电力建设 ›› 2012, Vol. 33 ›› Issue (3) : 79-82.
发电技术

印度火电厂的主要热力系统及主要设备

  • 郑赟
作者信息 +

Main Thermal System and Key Equipments of Power Plant in India

  • Henry Zheng
Author information +
文章历史 +

摘要

结合印度CEA火电厂设计导则和国内规范,以印度某300 MW火电厂工程为例,对其汽轮机主要汽水系统和设备选型设计与国内常规火电工程进行对比分析,总结了印度火电工程的设计特点及其依据,可为同类型印度火电工程的合同谈判提供更多的经验,对这些工程的设计具有借鉴意义。

Abstract

Combined with the design rules of Indian CEA and Chinese design standards, a 300 MW power station in India is taken as an example, to compare the main steam-water system and lectotype design of key equipments in Indian and Chinese thermal power engineering. The design features and design basis are summarized of Indian thermal power engineering, providing references for similar contract negotiation and detailed units design of Indian thermal power engineering.

引用本文

导出引用
郑赟. 印度火电厂的主要热力系统及主要设备[J]. 电力建设. 2012, 33(3): 79-82
Henry Zheng. Main Thermal System and Key Equipments of Power Plant in India[J]. Electric Power Construction. 2012, 33(3): 79-82

PDF(564 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/