摘要:
结合印度CEA火电厂设计导则和国内规范,以印度某300 MW火电厂工程为例,对其汽轮机主要汽水系统和设备选型设计与国内常规火电工程进行对比分析,总结了印度火电工程的设计特点及其依据,可为同类型印度火电工程的合同谈判提供更多的经验,对这些工程的设计具有借鉴意义。
Abstract:
Combined with the design rules of Indian CEA and Chinese design standards, a 300 MW power station in India is taken as an example, to compare the main steam-water system and lectotype design of key equipments in Indian and Chinese thermal power engineering. The design features and design basis are summarized of Indian thermal power engineering, providing references for similar contract negotiation and detailed units design of Indian thermal power engineering.
郑赟. 印度火电厂的主要热力系统及主要设备[J]. 电力建设, 2012, 33(3): 79-82.
Henry Zheng. Main Thermal System and Key Equipments of Power Plant in India[J]. ELECTRIC POWER CONSTRUCTION, 2012, 33(3): 79-82.