PDF(513 KB)
PDF(513 KB)
PDF(513 KB)
330 MW机组控制系统的节能优化设计
Optimization Design of Energy Saving for 330 MW Units Control Systems
国电驻马店热电有限公司原控制系统存在逻辑缺陷,控制品质较差。通过对该机组协调控制系统、送风控制系统、一次风控制系统、加热器疏水等系统进行故障诊断和优化设计,提高了机组控制系统的可用性,降低了发电煤耗。
The logical defects in the control system of Guodian Zhumadian Power Plant lead to bad control quality. Through the fault diagnosis and optimization design taken on the coordinating control system, air supply control system, primary air control system, heater drainage system, and so on, the availability of units’ control system has been improved and the coal consumption of electricity generation has been decreased.
control system / fault diagnosis / optimization / thermal power plant
[1]王汝武.电厂节能减排技术[M].北京:化学工业出版社,2008:2-50.
[2]中国电力企业联合会科技服务中心.节能与控制[M].北京:中国电力出版社,2008:12-50.
[3]衡丽君,张永福,韦红旗.220 t/h锅炉燃烧调整试验分析及优化运行[J].华北电力技术,2003(7):6-10.
[4]姚俊,祝建飞,金峰.1 000 MW机组节能型协调控制系统的设计与应用[J].中国电力,2010,43(6):79-84.
[5]刘秋新. 除尘系统的通风机故障诊断与节能运行分析[J]. 风机技术,2005(2):38-42.
[6]赵国振,李民,付强. 中储式制粉系统安装过程优化节能控制系统的可行性研究[J]. 节能,2011(4):54-57.
[7]吉加勇. 100 MW等级发电厂自动发电控制节能调节[J]. 电力设备,2006,7(7):81-83.
[8]巨林仓.电厂热工过程控制系[M]. 西安:西安交通大学出版社,2009:179-180.
[9]黄兴德,游喆,赵泓,等. 超(超)临界锅炉给水疏水系统流动加速腐蚀特征和风险辨识[J].中国电力,2011(2):37-42.
[10]杨建平,赵作起. 600 MW机组凝结水泵变频改造及应用[J]. 华电技术,2010,32(1):41-42.
AI小编
/
| 〈 |
|
〉 |