大跨越地面紧线时档距重构后的割线计算模型
Calculation Model of Conductor Removed-length after Span Reconstruction While Large-span Tensioning on Ground
分析了由于直线跨越塔悬垂绝缘子串倾斜,引起耐张段内档距重构的现象,建立了计算模型,并推导出大跨越地面紧线情况下割线长度的计算方法。经实践验证,该模型具有较高的计算精度。
The span reconstruction in the strain section is analyzed in this paper, which is caused by the inclination of suspension insulator strings in tangent tower, and then the calculation model is established. The calculation method of conductor removed-length is derived under the condition of large-span ground-tensioning. It is verified by practices that this model has higher calculation accuracy.
大跨越 / 档距重构 / 悬垂绝缘子串 / 倾斜 / 地面紧线
large-span / span reconstruction / suspension insulator string / inclination / tensioning on ground
[1] 黄克信.低弛度地面划印法——介绍500 kV平武线金口长江跨越紧线工艺技术[J].电力建设,1982,13(4):18-22.
[2]孙成国,陈世利.一牵二分次展放、低弛度地面画印法架线施工[J].吉林电力,2002(6):30-32.
[3]阮红兵,陈世利,孙成国.低弛度地面画印法架线施工线长调整计算[J].吉林电力,2003(1):35-37.
[4]邹俊,李祖元. 500 kV水布垭—潜江Ⅰ、Ⅱ回长江大跨越架线施工中弛度的控制[J]. 湖北电力,2008,32(4):11-13.
[5]孙德新. “耐—直—耐”跨越方式下导线弛度控制及地面划印割线计算[J].电力建设,2011,32(6):108-111.
[6] 王柏正.高空紧线技术在大跨越架线施工中的运用[J].电力建设,1994,25(2):32-34.
[7] 胡其秀.电力工程施工组织设计手册:送变电卷[M].北京:中国水利水电出版社,2004.
[8] 蔡生泉.高压架空输电线路张力架线[M].北京:水利电力出版社,1991.
[9] 邵天晓.架空送电线路电线力学计算[M].北京:中国电力出版社,2003.
[10] 李博之.高压架空输电线路施工技术手册:架线工程计算部分[M]. 北京:中国电力出版社,1998.