Multi-Stage Game Fault Recovery Method for Electricity-Gas Regional Integrated Energy System Under Reconfiguration and Repair Coordination

PENG Hanmei, ZHANG Ling, TAN Mao, SU Yongxin, LI Hui

Electric Power Construction ›› 2024, Vol. 45 ›› Issue (12) : 27-38.

PDF(1335 KB)
PDF(1335 KB)
Electric Power Construction ›› 2024, Vol. 45 ›› Issue (12) : 27-38. DOI: 10.12204/j.issn.1000-7229.2024.12.003
Key Technologies of Coordinated Operation for Regional Integrated Energy Systems Based on Flexibility Exploration ·Hosted by YANG Ming, WANG Chengfu·

Multi-Stage Game Fault Recovery Method for Electricity-Gas Regional Integrated Energy System Under Reconfiguration and Repair Coordination

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2024, 45(12): 27-38 https://doi.org/10.12204/j.issn.1000-7229.2024.12.003

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(1335 KB)

Accesses

Citation

Detail

Sections
Recommended

/