[1] |
HE Houyu1, HE Huaqin1, WANG Qian2, WANG Yanming1, GAO Lingjun1, LUO Zhao2, ZANG Haixiang3.
Cost Sharing of Distributed Photovoltaic Power Generation Considering Carbon Footprint and Transactions
[J]. Electric Power Construction, 2020, 41(6): 85-92.
|
[2] |
LIU Zifa, WANG Xinyue,YU Hanxiao, GAO Jianyu, WU Gang.
Interactive Power Pricing Strategy and Method for Real-Time Power Market with Multi-Microgrid Connection
[J]. Electric Power Construction, 2020, 41(3): 39-46.
|
[3] |
ZHAO Changshu, QIU Xiaoyan, ZHAO Youlin, LI Linghao,ZHANG Kai, LIU Mengyi.
A New UPFC System in the Framework of Ubiquitous Power Internet of Things
[J]. Electric Power Construction, 2020, 41(1): 39-44.
|
[4] |
YANG Pengpeng,ZHANG Xiuping,WANG Mingqiang,YANG Ming,ANG Fei,WANG Shibo.
Optimal Operation of Wind-PV-ES Joint System Considering the Peak Regulation Capability
[J]. Electric Power Construction, 2019, 40(9): 124-130.
|
[5] |
FAN Zhicheng, ZHU Junpeng, WU Han, YUAN Yue.
Distribution Planning Model in Active Distribution Network Considering Fuzziness and Randomness
[J]. Electric Power Construction, 2019, 40(2): 37-44.
|
[6] |
ZHOU Yu, YANG Ming,WANG Fei,WANG Shibo,ZHU Yi.
A Real-Time Dispatch Model Considering the Uncertainty in Photovoltaic Power
[J]. Electric Power Construction, 2019, 40(10): 1-8.
|
[7] |
ZHOU Buxiang, HUANG Jianan, HUANG Zhengang, ZHANG Baifu, ZHANG Ye.
Interval Economic Power System Dispatch Based on Improved TLBO Algorithm
[J]. Electric Power Construction, 2018, 39(9): 105-111.
|
[8] |
SHENG Meng,ZHANG Shuya.
Study on the Optimal Replacement Time of Physical Assets in Power Grid on the Basis of Grey Theory
[J]. Electric Power Construction, 2018, 39(6): 131-.
|
[9] |
YANG Yulong, WANG Tong, MU Gang,YAN Gangui, LIU Jinsong,HAN Yue, LIU Ruitong,FAN Wei.
Evaluation of Peak-Shaving Capability of Distributed Electric Heating Load Group Based on Measured Data
[J]. Electric Power Construction, 2018, 39(12): 95-101.
|
[10] |
ZHANG Zhichang, FENG Mengshuang, HUI Jin, GUAN Li, QI Baozheng, CAI Hui, XU Haihua, ZHU Xingyang,HUO Molin.
Optimization Hotspot Region Based Integrated Demand Response Model of User-side Combined Heat and Power Unit
[J]. Electric Power Construction, 2018, 39(11): 20-27.
|
[11] |
WANG Zhiqiang1,ZHANG Xinyue,WANG Shan,WANG Lingfei,GONG Qi,LIU Wenxia,LI Jiefu,NIU Qiang.
Cooperative Optimization of Regional Heating Mode Using Abandoned Wind and Equipment Capacity Configuration
[J]. Electric Power Construction, 2018, 39(10): 82-91.
|
[12] |
HONG Bowen, LI Qionghui, HE Yongsheng, HUANG Bibin, ZHENG Zhanghua.
Applications and Prospect of Virtual Power Plant in Distributed Photovoltaic Generation Application Demonstration Area
[J]. Electric Power Construction, 2017, 38(9): 32-.
|
[13] |
YIN Wei,TONG Qinyi,XU Yang,WANG Liang,DONG Shufeng,HE Zhongxiao.
An Economic Dispatch Strategy of Plant Multi-Energy Microgrid Considering Life Cycle Cost of Equipment
[J]. Electric Power Construction, 2017, 38(12): 97-.
|
[14] |
TONG Xin, GUO Chunlin, ZHANG Mingzhi.
Price Guide of Electric Vehicles Charging Based on Cost Function
[J]. Electric Power Construction, 2016, 37(9): 30-.
|
[15] |
LIU Liping,PENG Bo,GU Xi,LIU Sheng,CHEN Cong,LIAO Zhiwei.
Comparison and Selection of Power Grid Planning Based on Life Cycle Cost
[J]. Electric Power Construction, 2016, 37(9): 101-.
|