Meteorological data of Yongxing weather station in Xisha from 1973 to 2011 were collected and analyzed. The annual mean wind speed, wind power density, utilization hour of specific wind turbine and annual energy output were calculated using Weibull statistical distribution and wind power curve of specific wind turbine. Combined with daily extreme wind speed data from 1973 to 2011, the extreme wind of 50-year recurrence interval was calculated using Peak over Threshold (POT) approach and Generalized Pareto distribution model. The analysis results show that the wind power density of Yongxing Island is less than expected, which is below 100W/m2 in a typical year, and it concentrates in the latter half of the year with more tropical cyclones, although the Yongxing Island is located in the deep sea. Moreover, the extreme wind of 50-year recurrence interval is 42.2 m/s, which is significantly higher than reference wind speed (27 m/s) on the land. Therefore, the wind turbine of higher class should be adopted in wind power development in Xisha.
Key words: wind power generation, wind resource, wind power density, extreme wind of 50-year recurrence
CHEN Ling, XU Wu, LIU Guangyuan, SU Sheng. Wind Resource Assessment and Extreme Wind of 50-Year Recurrence in Xisha[J]. ELECTRIC POWER CONSTRUCTION, 2014, 35(7): 131-135.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.cepc.com.cn/EN/10.3969/j.issn.1000-7229.2014.07.023
https://www.cepc.com.cn/EN/Y2014/V35/I7/131
[1]沈宏涛.山区风资源特点和风电场选址方法[J].电力建设,2013,34(12):92-96. [2]GB/T 18710—2002风电场风能资源评估方法[S].北京:中国标准出版社,2002:12-14. [3]牛山泉.风能技术[M].北京:科学出版社,2009:9-18. [4]白树华,卢继平.西藏高原的气候环境对风力发电的影响分析[J].电力建设,2006,27(11):37-40. [5]Idaho National Laboratory. Power curves of major manufacturer [EB/OL]. Idaho Arco: Idaho National Laboratory, 2012 [2014-03-9]. https://inlportal.inl.gov/portal/server.pt/community/wind_power/424/software. [6]李泽椿,朱蓉,何晓凤,等.风能资源评估技术方法研究[J].气象学报,2007,23(5):708-717. [7]李军军,吴政球,谭勋琼,等.风力发电及其技术发展综述[J].电力建设,2011,32(8):64-72. [8]黄维平,李兵兵.海上风电场基础结构设计综述[J].海洋工程,2012,30(2):150-156. [9]肖琦,王永杰,肖茂祥.特高压双回输电塔线体系风振响应研究[J].水电能源科学,2013,31(4):194-197. [10]DL/T 5158—2002 电力工程气象勘测技术规程[S].北京:国家经济贸易委员会,2002:20-22. [11]李宏男,王杨,伊廷华.极值风速概率方法研究进展[J].自然灾害学报,2009,18(2):15-26. [12]陈子燊,刘曾美,路剑飞.基于广义Pareto分布的洪水频率分析[J].水力发电学报,2013,32(2):68-73. [13]Palutikof J P, Brabson B B,Lister D H, et al.A review of methods to calculate extreme wind speeds [J]. Meteorological Applications,1999,6(2):119–132. [14]Kitamoto Laboratory. Hurricane list of the Pacific [EB/OL]. Tokyo: Kitamoto Laboratory, 2012 [2014-03-9]. http://agora.ex.nii.ac.jp/digital-typhoon/year. [15]International Electrotechnical Commission. International standard IEC 61400-1 Ed.3, Wind turbines – Part 1: Design requirements. 2005: 22-23.