[1] |
WANG Liang, GAI Zhengyu, JIANG Weiyong, SHI Yuxin, MENG Qingmeng.
Blocking Strategy for ±800 kV Yan-Huai UHVDC System in Island Operation Mode of Delivering Side
[J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(8): 40-47.
|
[2] |
YANG Yong, SHE Zhenqiu, SONG Shengli, LI Ming,WANG Jialong,FAN Jichao.
Design Optimization of Converter Valve Thyristor for New Generation of ±800 kV/8 GW UHVDC Project
[J]. Electric Power Construction, 2020, 41(6): 114-122.
|
[3] |
YU Yiping, ZHAO Jian, XIONG Haoqing, CHEN Qian, JU Ping.
Research on Interactive Simulation Method in PSASP for UHVDC Blocking
[J]. Electric Power Construction, 2019, 40(4): 18-25.
|
[4] |
CHEN Zhao, YUE Bo, YANG Qiming, LIU Siyuan, LI Qi.
Study on Main Circuit Design of ±1 500 kV UHVDC Transmission System
[J]. Electric Power Construction, 2019, 40(4): 128-134.
|
[5] |
QI Qingru, JIANG Weiyong, LIU Jianqin, CHANG Hao, ZHOU Zhuan.
Islanding Black-Start Method of UHVDC Power System Based on VSC-HVDC Technology
[J]. Electric Power Construction, 2017, 38(10): 138-.
|
[6] |
ZHAO Zheng, MA Weimin.
Reliability Research for UHVDC Transmission System with Parallel Converters
[J]. Electric Power Construction, 2016, 37(9): 86-.
|
[7] |
JIN Zuyang, YANG Honggeng, ZHAO Haishan.
Abnormal Commutation Failure Mechanism in UHVDC Transmission System
[J]. Electric Power Construction, 2016, 37(7): 126-132.
|
[8] |
MIAO Lili, ZHU Kunlin, WEN Boying.
Analysis and Calculation of Main Circuit Steady-State Parameters of UHVDC Transmission System with Hierarchical Connection Mode
[J]. Electric Power Construction, 2016, 37(2): 91-99.
|
[9] |
WANG Jing, HAN Minxiao, YAO Shujun, TIAN Chunzheng, SI Ruihua, TANG Xiaojun.
Operation Characteristic Analysis for UHVDC Transmission in Separating Pole Connection Mode
[J]. Electric Power Construction, 2016, 37(10): 54-.
|
[10] |
CHEN Kai,DUAN Xiangying,GUO Xiaojiang.
Stability Control Analysis of UHV AC/DC Hybrid Power Grid
[J]. Electric Power Construction, 2016, 37(1): 64-69.
|
[11] |
LI Gaowang, LI Yanan, ZOU Xin.
AC-Side Transient Overvoltage in ±800 kV Ximeng-Taizhou UHVDC Transmission Project
[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(9): 57-61.
|
[12] |
SHEN Xiaolin, MA Weimin, BAI Guangya, NIE Dingzhen.
Simulation and Investigation on Capacitive Recovery Voltage of 800 kV AC Filter Sub-Bank Circuit Breaker in UHVDC Converter Station
[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(9): 73-77.
|
[13] |
ZHANG Yunxiao, LI Cunjun, PU Ying, DING Yigong, MA Yulong, LU Yajun .
Interface and Test of UHVDC Control System and Valve Control System
[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(9): 78-82.
|
[14] |
LI Fengqi,SHE Zhenqiu,XU Haijun,LOU Dianqiang,YE Tinglu.
Running Analysis of XSH800 UHVDC Transmission System in Last 5 Years
[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(9): 103-111.
|
[15] |
LU Yajun, PU Ying, MA Yulong, SONG Shengli, LYU Pengfei.
Key Measure for Monopol/Bipole Blocking in UHVDC Project
[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(9): 117-122.
|