[1] |
GAO Jianwei, LANG Yutong, GAO Fangjie, GUO Guiyu , LIANG Pengcheng .
Timing Planning for Investment of Wind Farm Clusters According to Copula-UCVaR Risk Measurement
[J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(8): 78-86.
|
[2] |
JIN Wentao, NIU Meng, LU Hongzhang, LI Jianlin.
Evaluation Method for Convergence Potential of Distributed Energy Storage on Customer Side
[J]. Electric Power Construction, 2019, 40(4): 34-41.
|
[3] |
XU Mingming, YAO Sen, NIU Rongze, HU Bo, XU Hengbo, XIE Kaigui, ZHOU Ning, HAO Yu.
Risk Evaluation of Repeated Multiple Power Outages in the Distribution Network
[J]. Electric Power Construction, 2018, 39(8): 111-115.
|
[4] |
ZHU Lin,WANG Bei,CHEN Da,ZHANG Jian.
Research on Doubly-Fed Wind Farm Polymerization Based on Similar Coherency
[J]. Electric Power Construction, 2018, 39(7): 89-96.
|
[5] |
LIN Qingming, HU Xu, BIAN Xiaoyan, LI Haixia, JIANG Ying.
Multi-Turbine Equivalent Frequency Control Considering Wake Effect of Offshore Wind Farms
[J]. Electric Power Construction, 2018, 39(2): 116-.
|
[6] |
XU Peidong,FANG Hualiang,HUANG Shuo.
Dispersed Wind Farm Locating and Sizing Considering Wind Power Consumption and Power Flow Balance
[J]. Electric Power Construction, 2018, 39(1): 99-.
|
[7] |
DING Fanfan, ZHANG Dahai,LIU Hui, HE Jinghan.
Evaluation and Forecast of Electrified Railway Influence on Wind Farm
[J]. Electric Power Construction, 2018, 39(1): 119-.
|
[8] |
WEI Mengyang, LIU Liming, LI Yaohua, WANG Yong, WANG Fei.
Wind Power Output Pattern Clustering for Severing Prediction Evaluation
[J]. Electric Power Construction, 2017, 38(6): 108-.
|
[9] |
RU Yeqi, ZHOU Bin, WU Yibei, LI June, YUAN Kai, LIU Kaipei.
Reliability Analysis of Business in Grid Cyber Physical System Considering the Factors of Cyber Attacks
[J]. Electric Power Construction, 2017, 38(5): 38-.
|
[10] |
YANG Zhichao, GAO Bingtuan, YE Fei, BO Xin.
Maximum Output Optimal Control of Wind Farm Based on Wake Effect
[J]. Electric Power Construction, 2017, 38(4): 96-.
|
[11] |
TAN Maoqiang, HUANG Wei, CHE Wenxue, YAN Binyu, TAN Renshen.
Improved Pareto Optimality Based on Multi-Objective Micro-Siting Planning of Offshore Wind Farm
[J]. Electric Power Construction, 2017, 38(4): 103-.
|
[12] |
YI Chen,REN Jianwen,QI Jianwen.
Fuzzy Optimal Dispatch of Wind Power Consumption Considering Demand Response
[J]. Electric Power Construction, 2017, 38(4): 127-.
|
[13] |
LIU Hongbo,LIU Haihan,NIE Jianhang.
Improved Control Strategy of Inverter in VSC-HVDC Side with Integrating Wind Power
[J]. Electric Power Construction, 2017, 38(10): 10-.
|
[14] |
YANG Jingang,LIU Weimiao, LI Shunxin,DENG Tianhu,SHI Zhiping,HU Zechun.
Optimal Operation Scheme and Benefit Analysis of Wind-Hydrogen Power Systems
[J]. Electric Power Construction, 2017, 38(1): 106-.
|
[15] |
LIN Li, ZHOU Peng, ZOU Lanqing.
Assemment and Influential Factors Analysis of Power Energy Efficiency Based on New Energy Industrial Orientation
[J]. Electric Power Construction, 2017, 38(1): 123-.
|