LIU Kaijun,GAO Yi,SONG Fulong. Risk Assessment Framework Design on Flexibility Power Grid Planning and Its Application Prospect[J]. ELECTRIC POWER CONSTRUCTION, 2014, 35(12): 1-5.
[1]电力工业部电力规划设计总院.电力系统设计手册[M].北京:中国电力出版社,1998.
[2]刘振亚.中国电力与能源[M].北京:中国电力出版社,2012.
[3]International Energy Agency.World energy outlook 2014[EB/OL].2014[2014-11-12].http://www.worldenergyoutlook.org/.
[4]Energy Information Administration (EIA).Annual energy outlook 2014 with projections to 2040[EB/OL].2014 [2014-09-20].http://www.eia.doe.gov/oiaf/aeo/.
[5]ENTSO-E.Ten-year network development plan (TYNDP)[EB/OL] .2012 [2014-09-18].http://www.entsoe.eu/major-projects/ten-year-network-development-plan/.
[6]Orths A ,Energinet.dk D,Bialek J et al.Connecting the dots: regional coordination for offshore wind and grid development[J].IEEE Power & Energy Magazine,2013,11 (6):83-95.
[7]Jha I S, Sehgal Y K, Sen S, et al.Grid integration of large scale renewable generation: initiatives in indian power system[C]//CIGRE ,Paris: CIGRE, 2014.
[8]Iliceto A. Transforming desertec vision into quantitative scenarios: simulations and optimization analysis for a decarbonised EUMENA power system[C]//CIGRE, Paris:CIGRE,2014.
[9]The power of transformation wind, sun and the economics of flexible power systems[R]. Paris: International Energy Agency(IEA),2014.
[10]刘振亚.特高压交直流电网[M].北京:中国电力出版社,2013.
[11]舒印彪,张运洲.优化我国能源输送方式研究[J].中国电力,2007,40 (11):4-8.
[12]刘振亚.智能电网技术[M].北京:中国电力出版社,2010.
[13]周孝信,陈树勇,鲁宗相.电网和电网技术发展的回顾与展望:试论三代电网[J].中国电机工程学报,2013,33(22):1-11.
[14]囯网北京经济技术研究院电网规划设计的技术经济方法和应用研究[R].北京:囯网北京经济技术研究院,2009.
[15]华东电网有限公司考虑全寿命周期成本管理的电网规划方案评价研究[R].上海:华东电网有限公司,2009.
[16]薛禹胜,费圣英,卜凡强.极端外部灾害中的停电防御系统构思(一):新的挑战与反思[J].电力系统自动化,2008,32(9):1-6.
[17]李晨光,郭剑波.国外电网规划可靠性准则综述[J].中国电力,2000,33(10):96-99.
[18]张文亮,丘明,来小康.储能技术在电力系统中的应用[J]. 电网技术,2008,32(7):1-9.
[19]钱伯章,朱建芳.大容量储能技术和产业发展的新动态[J].电网与清洁能源,2012,33(3):79-82.
[20]胡泽春,宋永华,徐智威,等.电动汽车接入电网的影响与利用[J].中国电机工程学报,2012,32(4):1-10.
[21]杨黎晖,许昭,J Stergaard,等.电动汽车在含大规模风电的丹麦电力系统中的应用[J].电力系统自动化,2011,35(14):43-47.
[22]麻常辉,薛禹胜,王小英,等.基于静态和动态安全风险的输电规划(二):计及注入功率的不确定性[J].电力系统自动化,2006,30(14):10-13.
[23]田廓,邱柳青,曾鸣.基于动态碳排放价格的电网规划模型[J]. 中国电机工程学报,2012,32(4):57-64.
[24]CIGRE WG37.Methods for planning under uncertainty-towards flexibility in power system development[J]. Electra, 1995, 161:143-164.
[25]Billinton R, Gao Y.Multi-state wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy[J].IEEE Transaction on Energy Conversion,2008,23(2) :163-170.
[26]Huang D, Billinton R.Effects of wind power on bulk system adequacy evaluation using the well-being analysis framework[J].IEEE Transaction on Power Systems,2009,24 (3):1232-1240.
[27]余贻鑫,王靖然,吕晓阳.基于安全性价值的含大风电的电力系统扩展规划[J].中国科学:技术科学,2012,42(7):815-827.
[28]George A,Alfredo V.Innovations in power systems reliability[M].London: Springer,2011.
[29]任震,梁振升,黄雯莹.交直流混合输电系统可靠性指标的灵敏度分析[J].电力系统自动化,2004,28(14):33-36.
[30]胡博,谢开贵,黎小林,等.HVDC 输电系统可靠性跟踪方法[J].中国电机工程学报,2005,30(10):29-35.
[31]Yong L,Singh C.A methodology for evaluation of hurricane impact on composite power system reliability[J].IEEE Transactions on Power Systems,2011,26(1):145-152.
[32]Billinton R,Singh G.Application of adverse and extreme adverse weather:modeling in transmission and distribution system reliability evaluation[J]. IEEE Proceedings,Generation,Transmission and Distribution,2006,153(1):115-120.
[33]徐文军,杨洪明,赵俊华,等.冰风暴灾害下电力断线倒塔的概率计算[J].电力系统自动化,2011,35(1):13-17.
[34]宋晓喆,汪震,甘德强,等.台风天气条件下的电网暂态稳定风险评估[J].电力系统保护与控制,2012,40(24):1-8.