[1] |
ZHOU Yu, YANG Ming,WANG Fei,WANG Shibo,ZHU Yi.
A Real-Time Dispatch Model Considering the Uncertainty in Photovoltaic Power
[J]. Electric Power Construction, 2019, 40(10): 1-8.
|
[2] |
QI Yan, LIU Dunnan, XU Erfeng,WANG Xudong, XU Yujie,LIU Mengxuan .
Key Issues and Prospects of Integrated Energy Service for Energy Internet in Park
[J]. Electric Power Construction, 2019, 40(1): 123-132.
|
[3] |
XU Ke, LIU Hong, TIAN Zhe, WANG Bo, NIU Jide.
Economic Probability Analysis of Urban Distributed Energy Supply System
[J]. Electric Power Construction, 2017, 38(2): 138-.
|
[4] |
SUN Tengfei, CHENG Haozhong, ZHANG Libo, ZHOU Qinyong, HE Hailei, ZENG Pingliang.
A Load-Carrying Capacity Evaluation Method of Transmission Line Based on Economy and Reliability Coordination
[J]. Electric Power Construction, 2016, 37(6): 70-78.
|
[5] |
WU Zechen, WANG Xiuli, XIAO Yunpeng, LIU Wei, ZOU Yuntao, DU Chao, CHEN Xinyan.
Electricity Market Price Effect Analysis and National Economy Warning Platform Development
[J]. Electric Power Construction, 2016, 37(3): 2-7.
|
[6] |
LIANG Xuming, XUE Gengxin,QIE Xin,LI Lianhai, XIANG Liheng,HAN Bin.
Preliminary Experimental Scheme of Half Wavelength AC Power Transmission in Real Line
[J]. Electric Power Construction, 2016, 37(2): 85-90.
|
[7] |
LU Jiaming1, ZHAO Yun1, ZHENG Ming2, YU Hongqiang1.
Reactive Power Configuration Influence on Output Cable Loss of Offshore Wind Farm
[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(6): 114-118.
|
[8] |
LIU Lianguang, CHEN Weihua, LIU Zifa,CHEN Yanwei.
Large Power Grid Adaptability Evaluation Problem and Evaluation System
[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(10): 138-143.
|
[9] |
PAN Shaocheng, FANG Xiaoming, LIU Zhaokang, LI Zeng.
New Double-Column Transposition Tower for 1 000 kV UHVAC Power Transmission Line
[J]. ELECTRIC POWER CONSTRUCTION, 2014, 35(8): 67-71.
|
[10] |
YE Hongsheng, MAO Qingchuan, WANG Bin.
Application of High Conductivity Aluminum-Clad Steel Reinforced Conductors in Transmission Line
[J]. ELECTRIC POWER CONSTRUCTION, 2014, 35(8): 108-112.
|
[11] |
LI Huijun, JIAO Yingzhi, JIA Baotong.
Thermal Economy Analysis of Atomized Make-Up Water for Direct Air-Cooling Unit
[J]. ELECTRIC POWER CONSTRUCTION, 2014, 35(5): 118-121.
|
[12] |
HE Hailei, LI Fuqiang, ZHOU Qinyong, HU Bo, ZHANG Libo, DONG Jizhe.
Analysis and Framework Design of Power System Security-Economic Coordination Calculation
[J]. ELECTRIC POWER CONSTRUCTION, 2014, 35(11): 60-64.
|
[13] |
HUANG Daochun, HUANG Zhengfang, ZHANG Yuan, WANG Guoli, RUAN Jiangjun, PI Weicai.
Influencing Factors of Composite Insulator and Grading Ring Surface Electric Fields in UHV AC Power Transmission Lines
[J]. ELECTRIC POWER CONSTRUCTION, 2013, 34(9): 42-47.
|
[14] |
JIANG Liang, ZHANG Lingxia, ZHU Yadong, YU Lijun, WU Shuangying.
Thermo-Economic Analysis of Evaporator in Organic Rankine Cycle System
[J]. ELECTRIC POWER CONSTRUCTION, 2013, 34(9): 76-81.
|
[15] |
DONG Tiezhu,BAI Feng,LI Haipeng,WU Haiyang, YANG Wenhui,LI Xiangmin,WANG Hongxuan.
Simulation Study on Electromagnetic Influence of 750 kV Double Circuit Transmission Lines in Xinjiang on Nearby Petroleum & Gas Pipelines
[J]. ELECTRIC POWER CONSTRUCTION, 2013, 34(8): 40-46.
|