Design and Construction of Track Foundation of Totally-Enclosed Self-Assembly Building for UHV GIS Field Installation

LIU Jiannan1,YAN Guozeng1,NI Xiangping1,BIAN Xiujie1,ZHU Haiwei2,FU Baoliang1,ZHANG Erle1   

  1. 1. State Grid AC Engineering Construction Co., Beijing 100052, China;2. East China Electric Design Institute, Shanghai 200063, China
  • Online:2015-02-01

Abstract: The installation of 1 000 kV gas insulated metal-enclosed switchgear (GIS) is a very important process in the construction of UHV AC substation project. In order to ensure the conditions for UHV GIS installation and provide comfortable working environment for workers, the State Grid AC Engineering Construction Company actively developed a totally-enclosed self- assembly building for UHV GIS installation, which had been widely applied in three new-built substation projects of Zhebei-Fuzhou UHV AC power transmission project. This paper gave a general introduction of self-assembly building and mainly studied the design of track foundation for self-assembly building. Based on the actual application effect of self-assembly building in Zhebei-Fuzhou project, this paper introduced and analyzed the selection of the form and located position of self-assembly building track foundation, as well as the influence of self-assembly building track foundation on the construction of nearby equipment foundations.

Key words: 1 000 kV GIS, self-assembly building, GIS installation, track foundation, foundation design, strip foundation