Monthly
ISSN 1000-7229
CN 11-2583/TM
ELECTRIC POWER CONSTRUCTION ›› 2015, Vol. 36 ›› Issue (7): 61-68.doi: 10.3969/j.issn.1000-7229.2015.07.008
Previous Articles Next Articles
LIU Junyong, XIANG Yue, YANG Wei, ZHOU Hao, ZHAO Shengxia, XU Wei, DUAN Haoxiang, ZHANG Chengjia
Online:
2015-07-01
Supported by:
Project Supported by National Natural Science Foundation of China (51377111).
CLC Number:
LIU Junyong, XIANG Yue, YANG Wei, ZHOU Hao, ZHAO Shengxia, XU Wei, DUAN Haoxiang, ZHANG Chengjia. Key Technology Analysis and Study for Charging and Swapping Service Network and Its Coordinated Planning with Distribution Network[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(7): 61-68.
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.cepc.com.cn/EN/10.3969/j.issn.1000-7229.2015.07.008
[1]Dickerman L, Harrison J. A new car, a new grid[J]. IEEE Power & Energy Magazine, 2010, 8(2): 55-61. |
[1] | ZHANG Weiguo, CHEN Liangliang, CHENG Haisheng, FU Rong, JI Juan. Elastic Load Scheduling Based on Awareness of Electric Vehicle Power Supply Resources [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(8): 48-56. |
[2] | WU Dingjie, LI Xiaolu. Charging Load Prediction of Electric Vehicle According to Real-Time Travel Demand and Traffic Conditions [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(8): 57-67. |
[3] | HUANG Jiaqi, ZHANG Yuwei, HE Jifeng1, YAN Jiong, ZHU Xu, YANG Jun. A Robust Expansion Planning Method for Distribution Networks Considering Extreme Scenarios [J]. Electric Power Construction, 2020, 41(7): 67-74. |
[4] | TAN Zhongfu,TAN Caixia,PU Lei,YANG Jiacheng. Two-Layer Game Model of Virtual Power Plant Applying CIQPSO Algorithm [J]. Electric Power Construction, 2020, 41(6): 9-17. |
[5] | HU Jue, WEI Gang, YUAN Hongtao, LUO Zhigang. Modeling of EV Charging-Swapping-Storage Integrated Station [J]. Electric Power Construction, 2020, 41(6): 44-51. |
[6] | LIU Hui, XIE Liangfeng, XIE Haimin, YANG Yude, QIN Zhijun. Network Loss Evaluation of Power Systems Considering Participation of Electric Vehicles in AGC [J]. Electric Power Construction, 2020, 41(6): 52-59. |
[7] | GAO Chong, ZENG Guangxuan, ZHANG Junxiao, CAO Huazhen,TANG Junxi,YU Tao. Reliability Assessment of Distribution Network Cyber-Physical System Using Goal-Oriented Method [J]. Electric Power Construction, 2020, 41(5): 58-65. |
[8] | ZHANG Zhirong, QIU Xiaoyan, SUN Xu, REN Hao, ZHANG Mingke. Economic Optimal Scheduling of AC/DC Distribution Network Coordinating Flexible Load and Energy Storage Systems#br# [J]. Electric Power Construction, 2020, 41(5): 116-123. |
[9] | ZHOU Bin,ZHANG Weiguo, CUI Wenjia, MAO Dongyu, CHEN Zhong. Optimization Method for Electric Vehicle Charging/Discharging Considering Forewarning Load [J]. Electric Power Construction, 2020, 41(4): 10-21. |
[10] | ZHAO Wenhui, ZHANG Jiuyang, GAO Jiaoqian,SONG Yajun. Discharge Pricing Model of Electric Vehicles Considering Dynamic Electricity and Infinite Game [J]. Electric Power Construction, 2020, 41(4): 30-37. |
[11] | ZHONG Shiyuan, XIONG Ning, ZHANG Chenghao, LI Yingxue, SHU Jiao1 ZHANG Peng. A Collaborative Planning Method for Distribution Network Structure and Distribution Automation Terminal [J]. Electric Power Construction, 2020, 41(3): 23-30. |
[12] | LIU Zifa, WANG Xinyue,YU Hanxiao, GAO Jianyu, WU Gang. Interactive Power Pricing Strategy and Method for Real-Time Power Market with Multi-Microgrid Connection [J]. Electric Power Construction, 2020, 41(3): 39-46. |
[13] | SHI Jingjian, ZHOU Wentao, ZHANG Ning, CHEN Qiao, LIU Jintao,CAO Zhenbo, CHEN Yi, SONG Hang, LIU Youbo. Deep Reinforcement Learning Algorithm of Voltage Regulation in Distribution Network with Energy Storage System [J]. Electric Power Construction, 2020, 41(3): 71-78. |
[14] | SHEN Qingwen, CHENG Ruofa, FU Xin. Optimization Configuration Method of Distributed Power Supply Considering Vulnerability Index [J]. Electric Power Construction, 2020, 41(3): 54-61. |
[15] | REN Junzhi, CHEN Jian, JIANG Xinyi, SUN Xuri, ZHANG Song, LI Wensheng. Post-Disaster Recovery Strategy of Resilient Distribution Network Considering Mobile Energy Storage System and Network Reconfiguration [J]. Electric Power Construction, 2020, 41(3): 86-92. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Copyright @ ELECTRIC POWER CONSTRUCTION Editorial Office
Address: Tower A225, SGCC, Future Science & Technology Park,Beijing, China Postcode:102209 Telephone:010-66602697
Technical support: Beijing Magtech Co.ltd support@magtech.com.cn