AC-Side Transient Overvoltage in ±800 kV Ximeng-Taizhou UHVDC Transmission Project

LI Gaowang, LI Yanan, ZOU Xin   

  1. State Power Economic Research Institute, Beijing 102209, China
  • Online:2015-09-01

Abstract:

The AC-side transient overvoltage level of converter station directly affects the insulation coordination and operation safety of the equipments in converter station. The mechanism and influence factors of the AC-side transient overvoltage of converter station were analyzed. The EMTDC electromagnetic transient simulation model was established based on Ximeng-Taizhou ± 800 kV UHVDC transmission project, and the AC-side transient overvoltage level of converter stations in transmitter/receiver system of this project were calculated. The results show that the switching impulse protective level can be set to 761 kV if the 500 kV AC bus in transmitter/receiver system uses the arrester with 396 kV rated voltage; the switching impulse protective level can be set to 858 kV if the rated voltage of arrester is 420 kV; and the switching impulse protective level can be set to 1460 kV if the 1 000 kV AC bus in receiver system uses the arrester with 828 kV rated voltage. The calculation results can provide technical reference for subsequent research and construction.

Key words: UHVDC transmission, transient overvoltage, arrester