[1]刘泽洪.向家坝—上海±800 kV特高压直流输电工程建设成就[J].中国三峡, 2012(11):65-70.
[2]Yuan Q Y, Ling Y. Xiangjiaba-Shanghai highest power of UHVDC ready for implementation[C]//Transmission and Distribution Conference and Exposition, 2008.
[3]Gunnar A. Advantage of HVDC transmission at 800 kV[C]//14th ISH, China, 2005.
[4]strom U, Lescale, V F, Menzies D.The Xiangjiaba-Shanghai 800 kV UHVDC project, status and special aspects[C]//Power System Technology (POWERCON), 2010 International Conference.
[5]Dong Wu, strom U, Flisberg G. External insulation design of converter stations for Xiangjiaba-Shanghai ±800 kV UHVDC project[C]//Power System Technology (POWERCON), 2010 International Conference.
[6]Zhang Cuixia; Zhang Liuchun. Insulation coordination optimization study for ±800 kV UHVDC project with increased transmission capacity[C]//Power and Energy Society General Meeting (PES), 2013 IEEE.
[7]Yuan Q Y. Implementation of new computer technology for UHVDC power of transmission[C]//Computational Technologies in Electrical and Electronics Engineering, 2008. SIBIRCON 2008. IEEE Region 8 International Conference.
[8]Bennett M G. A survey of the relibility of HVDC systems through the world during 2009-2010[C]//CIGRE 2012.
[9]Bennett M G. A survey of the relibility of HVDC systems through the world during 2011-2012[C]//CIGRE 2014.
[10]Praca A. ITAIPU HVDC transmission system 10 years operational experience[C]//V SEPOPE, Brasil, 1996.
[11]马为民. 特高压直流输电系统可靠性和可用率指标研究[J].电力设备,2007,3(8): 85-88.
Ma Weimin,Li Yanan,Zhou Jing.Reliability and availability index study of UHVDC system[J].Electrical Equipment,2007,3(8):85-88. |