Coordinated Planning of Wind Farm Integration and Transmission Network Based on Multi-Scenario
WANG Xiuli1,ZHANG Kai2,ZENG Pingliang3,SUO Tao4
1. School of Electrical Engineering, Xian Jiaotong University, Xian 710049, China;2. State Grid Sichuan Economic Research Institute, Chengdu 610041, China;3. China Electric Power Research Institute, Beijing 100085, China;4. Xian Electric Engineering Company Limited, Xian 710075, China
WANG Xiuli,ZHANG Kai,ZENG Pingliang,SUO Tao. Coordinated Planning of Wind Farm Integration and Transmission Network Based on Multi-Scenario[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(10): 46-52.
[1]李俊峰.2012中国风电发展报告[R].北京:中国环境出版社,2012.
[2]张凯,王秀丽,李骏.基于多场景概率的风电场与输电网协调规划[C]//中国高等学校电力系统及其自动化专业第二十九届学术年会.宜昌,三峡大学.2013.
[3]高赐威,吴天婴,何叶,等.考虑风电接入的电源电网协调规划[J].电力系统自动化,2012,36(22):30-35.
Gao Ciwei,Wu Tianying,He Ye,et al.Generation and transmission coordinated planning considering wind power integration[J].Automation of Electric Power Systems,2012,36(22):30-35.
[4]余贻鑫,王靖然,吕晓阳.基于安全性价值的含大风电的电力系统扩展规划[J].中国科学,2012,42(7):815-829.
Yu Yixin,Wang Jingran,Lv Xiaoyang.Security value based expansion planning of power system with integration of large-scale wind power[J].Science China,2012,42(7):815-829.
[5]王茜.风电场与输电网协调规划的模型和方法研究[D].北京:华北电力大学,2011.
Wang Qian.Research on models and methods of coordinated planning between wind farms and transmission network [D].Beijing:North China Electric Power University,2011.
[6]高赐威,何叶.考虑风力发电接入的电网规划[J].电力科学与技术学报,2009,24(4):19-24.
Gao Ciwei,He Ye.Research of electric network planning with wind power integration considered [J].Journal of Electric Power Science and Technology,2009,24(4):19-24.
[7]Yu H,Chung C Y,Wong K P,et al.A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties [J].IEEE Transactions on Power Systems,2009,24(3):1568-1576.
[8]陈雁,文劲宇,程时杰.电网规划中考虑风电场影响的最小切负荷量研究[J].中国电机工程学报,2011,31(34):20-27.〖LL〗Chen Yan,Wen Jinyu,Cheng Shijie.Minimum load-curtailment in transmission network planning considering integrated wind farms [J].Proceedings of the CSEE,2011,31(34):20-27.
[9]唐杰斌.考虑风能接入的多场景电网规划及其风险评估 [D].北京:北京交通大学,2011.
Tang Jiebin.Multi-scenario network planning and risk assessment considering wind power connection [D].Beijing:Beijing Jiaotong University,2011.
[10]袁 越,吴博文,李振杰,等.基于多场景概率的含大型风电场的输电网柔性规划[J].电力自动化设备,2009,29(10):8-12. Yuan Yue,Wu Bowen,Li Zhenjie,et al.Flexible planning of transmission system with large wind farm based on multi-scenario probability [J].Electric Power Automation Equipment,2009,29(10):8-12.
[11]Billinton R,Wangdee W.Reliability- based transmission reinforcement planning associated with large-scale wind farms [J].IEEE Transactions on Power Systems,2007,1(22):34-41.
[12]Karki R,Hu P,Billinton R.A simplified wind power generation model for reliability evaluation[J].IEEE Transactions on Energy Conversion,2006,21(2):553-540.
[13]雷亚洲,王伟胜,印永红.风电场对电力系统运行价值分析[J].电网技术,2002,26(5):10-14.
Lei Yazhou,Wang Weisheng,Yin Yonghong.Analysis of wind power value to power system operation [J].Power System Technology,2002,26(5):10-14.
[14]唐杰斌.考虑风能接入的多场景电网规划及其风险评估 [D].北京:北京交通大学,2011.
Tang Jiebin.Multi-scenario network planning and risk assessment considering wind power connection [D].Beijing:Beijing Jiaotong University,2012.
[15]余秋霞.输电网规划建模与决策分析研究[D].武汉:华中科技大学,2008.
Yu Qiuxia.Study on modeling and decision-making for transmission expansion planning[D].Wuhan:Huazhong University of Science and Technology,2008.
[16]张俊芳,王秀丽,王锡凡.遗传算法在电网规划应用中的改进[J].电网技术,1997,21(4):25-32.
Zhang Junfang,Wang Xiuli,Wang Xifan.Improving transmission network planning model by using genetic algorithm [J].Power System Technology,1997,21(4):25-32.
收稿日期:2015-07-03 修回日期:2015-09-10