[1]刘振亚,张启平,董存,等.通过特高压直流实现大型能源基地风、光、火电力大规模高效率安全外送研究[J].中国电机工程学报,2014,34(16):2513-2522.
Liu Zhenya, Zhang Qiping, Dong Cun, et al. Efficient and security transmission of wind, photovoltaic and thermal power of large-scale energy resource bases through UHVDC projects[J]. Proceedings of the CSEE, 34(16):2513-2522.
[2]国家能源局.风电发展“十二五”规划.北京:国家能源局,2012.
[3]国网北京经济技术研究院.九个千万千瓦级风电基地输电规划.北京:国网北京经济技术研究院,2014.
[4]郭小江,赵丽莉,汤奕,等.风火打捆交直流外送系统功角暂态稳定研究[J]. 中国电机工程学报,2013,33(22):19-25.
Guo Xiaojiang, Zhao Lili, Tang Yi, et al. Study on angle transient stability for wind-thermal-bundled power transmitted by AC/DC system[J]. Proceedings of the CSEE, 2013,33(22):19-25.
[5]陈振寰,陈永华,行舟,等.大型集群风电有功智能控制系统控制策略(二)风火电“打捆”外送协调控制[J].电力系统自动化,2011,35(21):12-15.
Chen Zhenhuan, Chen Yonghua, Xing Zhou, et al. A control strategy of active power intelligent control system for large cluster of wind farms part two coordination control for shared transmission of wind power and thermal power[J]. Automation of Electric Power Systems, 2011, 35(21):12-15.
[6]王青,杨悦,汪宁渤,等.风电与火电“打捆”外送系统频率调控策略研究[J].中国电力,2014,47(3):6-13.
Wang Qing, Yang Yue, Wang Ningbo, et al. Study on the frequency adjustment characteristics of wind power uniting thermal power outgoing system[J]. Electric Power, 2014, 47(3):6-13.
[7]李生福,张爱玲,李少华,等.“风火打捆”交直流外送系统的暂态稳定控制研究[J].电力系统保护与控制,2015,43(1):108-114.
Li Shengfu, Zhang Ailing, Li Shaohu, et al. Study on transient stability control for wind-thermal-bundled power transmitted by AC/DC system[J]. Power System Protection and Control,2015,43(1):108-114.
[8]姚力,黄镔,王秀丽,等.考虑风火联合外送的互联系统随机生产模拟[J].电网技术,2015,39(5):1219-1225.
Yao Li, Huang Bin, Wang Xiuli, et al. Probabilistic production simulation of interconnected system by considering the joint delivery of wind power and thermal power generation[J].Power System Technology,2015,39(5) 1219-1225.
[9]华文,徐政.风电火电打捆送出时的输电容量优化方法[J].电力系统保护与控制,2012,40(8):121-125.
Hua Wen, Xu Zheng. A method to optimize transmission capacity of wind power in combination with trermal power[J]. Power System Protection and Control, 2012,40(8):121-125.
[10]张强,冯艳虹,王绍德.特高压交流通道风火联合送电问题研究[J].中国电力,2012,45(6):1-4.
Zhang Qiang , Feng Yanhong , Wang Shaode. Research on UHV AC transmission of combined electricity generated from wind and thermal[J]. Electric Power,2012,45(6):1-4.
[11]王智冬,刘连光,刘自发,等.基于量子粒子群算法的风火打捆容量及直流落点优化配置[J].中国电机工程学报,2014,34(13):2055-2062.
Wang Zhidong, Liu Lianguang, Liu Zifa, et al. Optimal configuration of wind and coal power capacity and DC placement based on quantum PSO algorithm[J]. Proceedings of the CSEE, 2014, 34(13): 2055-2062.
[12]衣立东,朱敏奕,魏磊,等.风电并网后西北电网调峰能力的计算方法.[J].电网技术,2010,34(2):129-132.
Yi Lidong, Zhu Minyi, Wei Lei, et al. A computing method for peak load regulation ability of northwest china power grid connected with large-scale wind farms[J].Power System Technology,2010,34(2):129-132
[13]杨宏,刘建新, 苑津莎,等.风电系统中常规机组负调峰能力研究[J].中国电机工程学报,2010,30(16):26-31.
Yang Hong, Liu Jianxin, Yuan Jinsha. Research of peak load regulation of conventional generators in wind power grid[J]. Proceedings of the CSEE, 2010,30(16):26-31.
|