DONG Meiling,YOU Dahai, WANG Gang, CHEN Weihua . Comprehensive Decision-Making of Transmission Network Planning Schemes Based on Cloud Model[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(10): 154-160.
[1]程浩忠. 电力系统规划[M]. 北京:中国电力出版社,2008:111-115.
[2]聂宏展,吕盼,乔怡,等. 基于熵权法的输电网规划方案模糊综合评价 [J].电网技术.2009,33(11):60-64.
Nie Hongzhan,Lv Pan,Qiao Yi,et al. Comprehensive decision-making of alternative transmission network planning based on entropy weight method [J].Power System Technology,2009,33(11):60-64.
[3]刘亚丽. 基于DEAHP方法的输电网规划方案综合评价及决策 [D]. 济南:山东大学,2010.
Liu Yali. Comprehensive evaluation and decision-making for tansmission network planning alternatives based on DEAHP method [D]. Shandong University,2010.
[4]聂宏展,聂耸,乔怡,等. 基于主成分分析法的输电网规划方案综合决策[J].电网技术.2010,34(6):134-138.
Nie Hongzhan,Nie Song,Qiao Yi,et al. Comprehensive decision-making of alternative transmission network planning based on principal component analysis [J].Power System Technology,2010,34(6):134-138.
[5]罗毅,李昱龙. 基于熵权法和灰色关联分析法的输电网规划方案综合决策[J].电网技术. 2013,37(1):77-81.
Luo Yi,Li Yulong. Comprehensive decision-making of alternative transmission network planning based on entropy weight and Grey relational analysis method [J].Power System Technology,2013,37(1): 77-81.
[6]Li Z H, Lin Y, Chen W H, et al. Fuzzy comprehensive evaluation for transmission grid planning based on combination weight[J]. Power and Energy, 2015: 91.
[7]李德毅,孟海军,史雪梅. 隶属云和隶属云发生器 [J]. 计算机研究与发展, 1995,32(6):15-20.
Li Deyi,Meng Haijun,Shi Xuemei. Membership clouds and membership cloud generators [J]. Computer Research & Development,1995,32(6):15-20.
[8]李德毅,刘常昱. 论正态云模型的普适性 [J]. 中国工程科学, 2004,6(8):28-34.
Li Deyi,Liu Changyu.Study on the universality of the normal cloud model [J].Engineering Science,2004,6(8):28-34.
[9]廖良才,范林军,王鹏. 一种基于云理论的组织绩效评估方法 [J]. 系统工程, 2010(1):99-104.
Liao Liangcai,Fan Linjun,Wang Peng. Method of evaluating organizational performance based on cloud theory [J]. Systems Engineering. 2010(1):99-104.
[10]赵会茹,李娜娜,李天友,等. 基于AHP_云模型配电网故障对象的停电后果评估 [J].华东电力, 2013,41(7):1456-1460.
Zhao Huiru,Li Nana,Li Tianyou,et al. Outage consequence assessment for distribution network failure objects based on AHP cloud model [J]. East China Electric Power, 2013,41(7):1456-1460.
[11]郭亚军. 综合评价理论、方法及应用 [M]. 北京:科学出版社,2007.
[12]孙凯,鞠晓峰,李煜华. 基于变异系数法的企业孵化器运行绩效评价[J]. 哈尔滨理工大学学报, 2007,(03): 165-167.
Sun Kai,Ju Xiaofeng,Li Yuhua. Performance evaluation of enterprise incubators based on variation coefficient method[J]. Journal of Harbin University of Science and Technology, 2007,(03):165-167.
[13]Romero R, Monticelli A, Garcia A, et al. Test systems and mathematical models for transmission network expansion planning [J]. IEE Proceedings of Generation Transmission and Distribution. 2002,149(1):27-36.
[14]李昱龙. 输电网规划方案综合评价方法研究与应用 [D]. 北京: 华北电力大学, 2012.
Li Yulong. Application and research on comprehensive assessment modeling method for alternative transmission network planning [D]. North China Electric Power University,2012.