[1]肖创英.欧美风电发展的经验与启示 [M]. 北京: 中国电力出版社, 2010.
[2]汪新园, 郭瑞鹏. 风电大规模介入下计及负荷不确定性的电力系统可靠性评估 [J]. 华东电力, 2013, 41(2): 385-389.
Wang Xinyuan, Guo Ruipeng. Reliability assessment of power system with large-scale wind power integration considering load uncertainty [J]. East China Electric Power, 2013, 41(2): 385-389.
[3]余民, 杨宸, 蒋传文, 等. 风电并网后电力系统可靠性评估和备用优化研究 [J]. 电力系统保护与控制, 2012, 40(12): 100-104.
Yu Min, Yang Chen, Jiang Chuanwen, et al. Study on power system reliability and reserve optimization with wind power integration [J]. Power System Protection and Control, 2012, 40(12): 100-104.
[4]张宁, 康重庆, 陈治坪, 等. 基于序列运算的风电可信容量计算方法 [J]. 中国电机工程学报, 2011, 31(25): 1-9.
Zhang Ning, Kang Chongqing, Chen Zhiping, et al. Wind power credible capacity evaluation model based on sequence operation [J]. Proceedings of the CSEE, 2011, 31(25): 1-9.
[5]张宁, 康重庆, 周宇田, 等. 风电与常规电源联合外送的受端可信容量研究 [J]. 中国电机工程学报,2012, 32(10): 72-80.
Zhang Ning, Kang Chongqing, Zhou Yutian, et al. Evaluation of receiving-end credible capacity for joint delivery of wind power and conventional electricity generation [J]. Proceedings of the CSEE, 2012, 32(10): 72-80.
[6]曲翀, 王秀丽, 谢绍宇, 等. 不同风速模型和可靠性指标对风电可信容量评估的影响 [J]. 电网技术, 2013, 37(10):2896-2903.
Qu Chong, Wang Xiuli, Xie Shaoyu, et al. Impacts of different wind speed models and reliability indices on capacity credit evaluation of wind power [J]. Power System Technology, 2013, 37(10):2896-2903.
[7]Amelin M. Comparison of capacity credit calculation methods for conventional power plants and wind power [J]. IEEE Transactions on Power Systems, 2009, 24(2): 685-691.
[8]Zhu Songzhe, Zhang Yi, Chowdhury Ali A. Capacity credit of wind generation based on minimum resource adequacy procurement [J]. IEEE Transactions on Industry Applications, 2012, 48(2): 730-734.
[9]Abdullah M A, Muttaqi K M. Agalgaonkar A P. Estimation of capacity credits for wind generation plants in the south east Australian power grid [J]. Renewable Power Generation Conference 2nd IET, 2013.
[10]张建忠, 程明. 风力发电随机风速时间序列生产方法分析与评价 [J]. 风能, 2012(1):58-61. Zhang Jianzhong, Cheng Ming. Evaluation and analysis of wind power probabilistic wind speed time sequence determination method [J]. Wind Energy, 2012(1):58-61.
[11]Zhang N, Kang C, Duan C, et al. Simulation methodology of multiple wind farms operation considering wind speed correlation [J]. International Journal of Power and Energy Systems, 2010, 30(4): 264-273.
|