• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

ELECTRIC POWER CONSTRUCTION ›› 2015, Vol. 36 ›› Issue (12): 69-75.doi: 10.3969/j.issn.1000-7229.2015.12.011

Previous Articles     Next Articles

Optimization Method of Wind-Photovoltaic-Battery Power Collection Grid Scale in Meshed Grid Mode

LIU Lianguang1,JIANG Zhihua1, HAN Longyan1, LIU Zifa1, GE Xiaoning1, HU Zunzhang2   

  1. 1. State Key Laboratory for Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Beijing 102206, China;2. Maintenance Branch of State Grid Jibei Electric Power Company, Beijing 102488, China
  • Online:2015-12-01
  • Supported by:

    Project supported by the National Natural Science Foundation of China (51577058,U1204506).

Abstract:

Due to the characteristics of a large number of power connected into branches in power collection grid, the fault at the beginning of branches in wind-photovoltaic-battery power collection grid with radial and chain topologies will cause enormous power losses. To improve the reliability of wind-photovoltaic-battery generation system, the distribution network in meshed grid mode was proposed to construct wind-photovoltaic-battery power collection grid. On this basis, this paper establishes the optimization model of power collection grid scale with considering electricity revenue and cable cost constraint, as well as the optimization algorithm of power collection grid scale in meshed grid mode based on genetic algorithm theory. Then, this paper studies the power collection scale, electricity benefit and other problems of wind-photovoltaic-battery power collection grid in meshed grid mode. Finally, the research and example analysis prove the  collection advantage of power collection grid in meshed grid mode and the effectiveness of the proposed optimization model and algorithm.

Key words: meshed grid, wind farm, power collection grid, power collection capacity

CLC Number: