A Fast Calculation Method of Renewable Energy Accommodation Capacity Based on Equivalent Load Interval and Probability Production Simulation
GONG Benhui1,YAO Li1, FU Xu2,XIAO Han 3, LI Bin 3,WANG Xiuli1
1..School of Electrical Engineering, Xi'an Jiaotong University, Xi'an 710049, China;2. Northwest Electric Power Design Institute Co., Ltd., Xi'an 710075, China;3. Southwest Electric Power Design Institute Co., Ltd., Chengdu 61000, China
Online:2016-03-01
Supported by:
Project supported by China Power Engineering Consulting Group Corporation (Research on methods and models of intermittent power planning); State Grid(The Recruitment Program of Global Experts)(XTB51201400055)
GONG Benhui,YAO Li, FU Xu,XIAO Han,LI Bin,WANG Xiuli. A Fast Calculation Method of Renewable Energy Accommodation Capacity Based on Equivalent Load Interval and Probability Production Simulation[J]. Electric Power Construction, 2016, 37(3): 24-30.
[1]吕泉,王伟,韩水,等. 基于调峰能力分析的电网弃风情况评估方法[J].电网技术,2013,37(7):1887-1894.
LYU Quan, WANG Wei, HAN Shui,et al. A new evaluation method for wind power curtailment based on analysis of system reguation capability[J].Power System Technology,2013,37(7):1887-1894.
[2]中国可再生能源学会风能专业委员会.2014年中国风电装机容量统计[J].风能,2015(2):36-49.
[3]AKHMATOV V, KNUDSEN H. An aggregate model of a grid-connected large-scale, offshore wind farms for power stability investigations-importance of windmill mechanical system[J]. Electrical Power and Energy Systems,2002(24):709-717.
[4]CASTRO R M G, FERREIRA DE JESUS J M. A wind park reduced-order model using singular perturbations theory[J]. IEEE Transactions on Energy Conversion,1996,11(4):735-741
[5]王锡凡.电力系统随机生产模拟的等效电量函数法[J]. 西安交通大学学报,1984,18(6):13-26.
WANG Xifan. EEF approach to power system probabilistic modeling[J]. Journal of Xi'an Jiaotong University, 1984,18(6):13-25.
[6]王锡凡.包含多个水电机组的电力系统随机生产模拟[J]. 西安交通大学学报,1985,19(4):69-82.
WANG Xifan. Probabilistic simulation of multiple assigned-energy hydroelectric units[J]. Journal of Xi'an Jiaotong University, 1985,19(4):69-82.
[7]康重庆,夏清,相年德,等. 随机生产模拟的序列化分析[J].中国电机工程学报,2002,22(4):9-13.
KANG Chongqing, XIA Qing,XIANG Niande,et al.Sequence-based analysis of probabilistic production cost simulation[J].Proceedings of the CSEE,2002,22(4):9-13.
[8]王洪涛,刘旭,陈之栩,等. 低碳背景下基于改进通用生成函数法的随机生产模拟[J]. 电网技术,2013,37(3):597-603.
WANG Hongtao, LIU Xu, CHEN Zhixu, et al.Power system probabilistic production simulation based on improved universal generating function methods in low-carbon context[J].Power System Technology,2013,37(3):597-603.
[9]张节潭,程浩忠,胡泽春,等.含风电场的电力系统随机生产模拟[J].中国电机工程学报,2009,29(28):34-39.
ZHANG Jietan,CHENG Haozhong,HU Zechun,et al.Power system probabilistic production simulation including wind farms[J]. Proceedings of the CSEE,2009,29(28):34-39.
[10]曲翀,王秀丽,谢绍宇,等.含风电电力系统随机生产模拟的改进算法[J].西安交通大学学报,2012,46(6):115-121.
QU Chong,WANG Xiuli,XIE Shaoyu,et al.An improved algorithm for probabilistic production simulation of power systems with wind power[J].Journal of Xi'an Jiaotong University,2012,46(6):115-121.
[11]谈天夫,高山,李海峰,等.基于等效间隔-频率分布的含风电场电力系统随机生产模拟[J].电工技术学报,2014,29(12):148-157.
TAN Tianfu,GAO Shan,LI Haifeng,et al.Power system probability production simulation based on equivalent interval frequency distribution including wind farms[J].Transactions of China Electrotechnical Society,2014,29(12):148-157.
[12]刘纯,曹阳,黄越辉,等.基于时序仿真的风电年度计划制定方法[J].电力系统自动化,2014,38(11):13-19.
LIU Chun,CAO Yang,HUANG Yuehui,et al.An annual wind power planning method based on time sequential simulations[J].Automation of Electric Power System,2014,38(11):13-19.
[13]冯长有,梁志峰.考虑潮流断面约束的电力系统随机生产模拟[J].电网技术,2013,37(2):493-499.
FENG Changyou,LIANG Zhifeng.Power system probabilistic production simulation considering constraints of tie line power flows[J].Power System Technology,2013,37(2):493-499.
[14]姚力,黄镔,王秀丽,等.考虑风火联合外送的互联系统随机生产模拟[J].电网技术,2015,39(5):1219-1225.
YAO Li, HUANG bin, WANG Xiuli, et, al. Probabilistic production simulation of interconnected system by considering the joint delivery of wind power and thermal power generation [J]. Power System Technology,2015,39(5):1219-1225.
[15]张宏宇,印永华,申洪,等.大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31.
ZHANG Hongyu, YIN Yonghua, SHEN Hong, et al. Peak-load regulating adequacy evaluation associated with large-scale wind power intergration[J]. Proceedings of the CSEE,2011,31(22):26-31.