GUO Yongming, LIU Guanqi. Stochastic Optimization Scheduling Method for Pumped Storage Power System Considering Wind Curtailment Cost[J]. Electric Power Construction, 2016, 37(4): 29-34.
[1]刘吉臻,王海东,李明扬.含风电的电力系统机组组合问题研究综述[J].电力建设,2014,35(12):38-45.
LIU Jizhen,WANG Haidong,LI Mingyang.Review on unit commitment of power systems with wind power integration [J].Electric Power Construction,2014,35(12):38-45.
[2]郭飞,王智冬,王帅,等.我国风电消纳现状及输送方式[J].电力建设,2014,35(2):18-22.
GUO Fei,WANG Zhidong,WANG Shuai,et al.Consumption situation and transmission modes of wind power in China[J].Electric Power Construction,2014,35(2):18-22.
[3]陈国恩,宗鹏鹏,朱伟,等.计及可再生能源与负荷互补特性的储能随机调度[J].电力建设,2015,36(6):27-22.
CHEN Guoen,ZONG Pengpeng,ZHU Wei,et al.Stochastic dispatching of energy storage devices considering complementarity between renewable energy and load [J].Electric Power Construction,2015,36(6):27-22.
[4]BARTON J P,INFIELD D G.Energy storage and its use with intermittent renewable energy[J].IEEE Transaction on Energy Conversion,2004,19(2):441-448.
[5]刘芳,潘毅,杨军峰,等.风电-火电-抽水蓄能联合优化机组组合模型[J].中国电机工程学报,2015,35(4):766-775.
LIU Fang,PAN Yi,YANG Junfeng,et al.Unit commitment model for combined optimization of wind power-thermal power-pumped storage hydro[J].Proceedings of the CSEE,2015,35(4):766-775.
[6]王乐,周章,尉志勇,等.风电-抽水蓄能联合系统的优化运行研究[J].电网与清洁能源,2014,30(2):70-75.
WANG Le,ZHOU Zhang,WEI Zhiyong,et al.Research on optimal operation of hybrid wind power and pumped hydro storage system [J].Power System and Clean Energy,2014,30(2):70-75.
[7]邹金,赖旭,汪宁渤.以减少电网弃风为目标的风电与抽水蓄能协调运行[J].电网技术,2015,39(9):2472-2477.
ZOU Jin,LAI Xu,WANG Ningbo.Mitigation of wind curtailment by coordinating with pumped storage[J].Power System Technology,2015,39(9):2472-2477.
[8]吴义纯,丁明.基于蒙特卡罗仿真的风力发电系统可靠性评价[J].电力自动化设备,2004,24(12):70-72.
WU Yichun,DING Ming.Reliability assessment of wind power generation system based on Monte-Carlo simulation[J].Electric Power Automation Equipment,2004,24(12):70-72.
[9]罗超,杨军,孙元章,等.考虑备用容量优化分配的含风电电力系统动态经济调度[J].中国电机工程学报,2014,34(34):6109-6118.
LUO Chao,YANG Jun,SUN Yuanzhang,et al.Dynamic economic dispatch of wind integrated power system considering optimal scheduling of reserve capacity[J].Proceedings of the CSEE, 2014,34(34):6109-6118.
[10]国家电力监管委员会.电网企业全额收购可再生能源电量监管办法[Z].北京:国家电力监管委员会,2007.
[11]张国强,张伯明.考虑风电接入后二次备用需求的优化潮流算法[J].电力系统自动化,2009,33(8):25-28.
ZHANG Guoqiang,ZHANG Boming.Optimal power flow approach considering secondary reserve demand with wind power integration[J].Automation of Electric Power Systems,2009,33(8):25-28.
[12]徐帆,刘军,张涛,等.考虑抽水蓄能机组的机组组合模型及求解[J].电力系统自动化,2012,36(12):36-40.
XU Fan,LIU Jun,ZHANG Tao, et al. Unit commitment problem with pumped-storage unit[J]. Automation of Electric Power Systems,2012,36(12):36-40.
[13]胡泽春,丁华杰,孔涛.风电-抽水蓄能联合日运行优化调度模型[J].电力系统自动化,2012,36(2):36-41.
HU Zechun,DING Huajie,KONG Tao.A joint daily operational optimization model for wind power and pumped-storage plant[J]. Automation of Electric Power Systems,2012,36(2):36-41.
[14]王俊,蔡兴国,季峰,等.考虑新能源发电不确定性的可用输电能力风险效益评估[J].电力系统自动化,2012,36(14):108-112.
WANG Jun,CAI Xingguo,JI Feng,et al.Evaluation of risk and benefit of ATC relating to uncertainty of renewable energy power generation[J].Automation of Electric Power Systems,2012,36(14):108-112.
[15]艾欣,刘晓.基于需求响应的风电消纳机会约束模型研究[J].华北电力大学学报,2011,38(3):18-22.
AI Xin,LIU Xiao.Chance constrained model for wind power usage based on demand response[J].Journal of North China Electric Power University,2011,38(3):18-22.
[16]BREIMAN L. Bagging predictors[J].Machine Learning,1996,24(2):123-140.