TIAN Hongxun, ZHANG Xinghui, WU Hongbo. A Method Framework for Whole Process Asset Management Decision-Making in Power Networks[J]. Electric Power Construction, 2016, 37(4): 50-56.
[1]柳璐,王和杰,程浩忠,等.基于全寿命周期成本的电力系统经济性评估方法[J].电力系统自动化,2012,36(15):45-50.
LIU Lu,WANG Hejie,CHENG Haozhong,et al.Economic evaluation of power systems on life cycle cost[J].Automation of Electric Power Systems,2012,36(15):45-50.
[2]刘剑,张勇,杜志叶,等.交流输电线路设计中的全寿命周期成本敏感度分析[J].高电压技术,2010,36(6):1554-1559.
LIU Jian,ZHANG Yong,DU Zhiye,et al.Life cycle cost sensitivity analysis in AC transmission lines design[J].High Voltage Engineering,2010,36(6):1554-1559.
[3]宋春丽,刘涤尘,吴军,等.基于差异化全寿命周期成本的电网规划经济性评估方法[J].电网技术,2013,37(7):1845-1855.
SONG Chunli,LIU Dichen,WU Jun,et al.An economic assessment of power system planning based on differentiated life cycle cost[J].Power System Technology,2013,37(7):1845-1855.
[4]周江昕,管俊,苏卫华,等.考虑风险决策的全寿命周期成本的电网规划[J].中国电力,2013,41(4):768-772.
ZHOU Jiangxin,GUAN Jun,SU Weihua,et al.Life cycle cost power grid planning considering risk decision[J].East China Electric Power,2013,41(4):768-772.
[5]MITROPOULOS L K,PREVEDOUROS P D.Life cycle emissions and cost model for urban light duty vehicles[J].Transportation Research Part D:Transport and Environment,2015(41):147-159.
[6]SCHWABE O,SHEHAB E,ERKOYUNCU J.Uncertainty quantification metrics for whole product life cycle cost estimates in aerospace innovation[J].Progress in Aerospace Sciences,2015(77):1-24.
[7]帅军庆.电力企业资产全寿命周期管理理论、方法及应用[M].北京:中国电力出版社,2010.
SHUAI Junqing. Power enterprise asset life cycle management theories,methods and applications [M].Beijing:China Electric Power Press,2010.
[8]JIN Hao,HUANG Hai,DONG Wei,et al.Preliminary experience of a PDCA-Cycle and quality management based training curriculum for rat liver transplantation[J].Journal of Surgical Research,2012,176(2):409-422.
[9]沈力,滕乐天,徐宛蓉.用于衡量资产管理实效的综合评价指标体系[J].华东电力,2010,38(3):432-435.
SHEN Li,TENG Letian,XU Wanrong.A newly developed KPI framework to evaluate the overall assessment performance[J].East China Electric Power,2010,38(3):432-435.
[10]李培栋,洪梦琳,商桑.电网实物资产评价指标体系[J].电力建设,2014,35(8):145-150.
LI Peidong,HONG Menglin,SHANG Sang.Evaluation index system on grid physical assets[J].Electric Power Construction,2014,35(8):145-150.
[11]具小平,王波,江克宜.电网企业开展资产全寿命周期管理的本土化解决方案[J].能源技术经济,2010,22(10):63-66.
JU Xiaoping,WANG Bo,JIANG Keyi.Localized solution to the life cycle assets management in power grid enterprices[J].Energy Technology and Economics,2010,22(10):63-66.
[12]徐宛蓉.国际固定资产管理标准--PAS55剖析[J].中国设备工程,2011(6):5-8.
XU Wanrong.International fixed asset management standards-PAS55 analysis[J].China Plant Engineering,2011(6):5-8.
[13]范洲平.新的ISO 55000资产管理系列标准解读[J].中国标准化,2014(3):87-91.
FAN Zhouping.Interpretation of new asset management series standards-ISO 55000[J].China Standardization,2014(3):87-91.
[14]信江艳,董杰,陈代川.企业资产管理系统(EAM)设计与实施[M].北京:中国铁道出版社,2005.
XIN Jiangyan,DONG Jie,CHEN Daichuan.Enterprise asset management system (EAM) design and implementation[M].Beijing:China Railway Publishing House,2005.
[15]赖佳栋.电网企业资产管理模型及应用研究[D].重庆:重庆大学,2012.
LAI Jiadong.Research on asset management models and applications of power grid enterprise[D].Chongqing:Chongqing University,2012.
[16]SANTIAGO S B. 资产管理和寿命周期[J].设备管理与维修,2005(3):43-46.
SANTIAGO S B. Asset management and life cycle[J].Plant Maintenance and Engineering,2005(3):43-46.
[17]杜栋,庞庆华,吴炎.现代综合评价方法与案例精选[M].北京:清华大学出版社,2008.
DU Dong,PANG Qinghua,WU Yan.Modern evaluation method and case selection[M].Beijing:Tsinghua University Press,2008.
[18]姜益民,马骏.变压器的全寿命周期成本分析[J].变压器,2006,43(12):30-35.
JIANG Yimin,MA Jun.Analysis of life cycle cost of transformer[J].Transformer,2006,43(12):30-35.