• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

Electric Power Construction ›› 2016, Vol. 37 ›› Issue (4): 50-56.doi: 10.3969/j.issn.1000-7229.2016.04.008

Previous Articles     Next Articles

A Method Framework for Whole Process Asset Management Decision-Making in Power Networks

TIAN Hongxun1, ZHANG Xinghui1, WU Hongbo2   

  1. 1. State Grid Corporation of China, Beijing 100031, China;2. State Power Economic Research Institute, Beijing 102209, China
  • Online:2016-04-01

Abstract:

According to the issue that the application depth of the method and model in each link of life cycle asset management (LCAM) of power grid enterprises is not unified and its convergence and coordination are not enough, this paper analyzes the key business of power grid asset management and its decision-making demands. Based on the technical solutions of life cycle cost (LCC), risk assessment, priority ranking and asset wall method, we propose a method framework for whole process asset management decision-making, which runs through the whole process of power grid asset life cycle including network planning and management plans, procurement and engineering construction, operation and maintenance, decommissioning and/or disposal of assets. The proposed method framework makes clear the implementation of decision-making methods in each link, and provides framework and foundation for unifying the technical methods and models of power grid asset whole process management and solving the issues of mismatched and uncoordinated methods in each business link and bad actual business integration.

Key words: power grid asset, management decision, method frame

CLC Number: