Electric Power Construction ›› 2016, Vol. 37 ›› Issue (6): 134-141.doi: 10.3969/j.issn.1000-7229.2016.06.019

Previous Articles     Next Articles

Credible Capacity Assessment of Wind Power Considering Grid Constraints in Western Water-Enriched Region

XIAO Yong1, LI Xiaoying2, ZHAO Tianyang2, LIU Wenxia2   

  1. 1. Guizhou Electric Power Research Institute,Guiyang 550000, China;2.North China Electric Power University, Beijing 102206, China
  • Online:2016-06-01
  • Supported by:

    Project supported by Key Project of the National Research Program of China(2013BAA02B02 )

Abstract:

Credible capacity is an important index to evaluate the capacity value of distributed generation. According to the characteristics in western region of abundant wind power/hydropower located in the terminal of distribution network, distributed generation dispersedly accessing to the grid and the weak grid structure, this paper proposes the wind power credible capacity evaluation method considering grid constraint under the different operation strategies in local grid and intergration grid, adopts the local power grid scheduling and global credible capacity two-step algorithm to calculate the equivalent load capacity of system, and quantitatively analyzes the effect of grid connection in multiple types of power enrichment area on system adequacy. Taking a certain water-enriched regional grid in western region as example, we calculated the capacity credible of wind power, at the same time researched the influence of three different operation modes of local and external power system on the overall adequacy of system, and proposed relevant operation suggestions.

Key words: credible capacity of wind power, grid constraints, equivalent load capability, optimal scheduling