• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

Electric Power Construction ›› 2018, Vol. 39 ›› Issue (12): 95-101.doi: 10.3969/j.issn.1000-7229.2018.12.012

Previous Articles     Next Articles

Evaluation of Peak-Shaving Capability of Distributed Electric Heating Load Group Based on Measured Data

YANG Yulong1, WANG Tong1, MU Gang1,YAN Gangui1, LIU Jinsong2,HAN Yue2, LIU Ruitong2,FAN Wei2   

  1. 1.School of Electrical Engineering,Northeast Electric Power University,Jilin 132012,Jilin Province,China;2.Electric Power Research Institute,State Grid Liaoning Electric Power Co., Ltd.,Shenyang 110000, China
  • Online:2018-12-01
  • Supported by:
    This work is supported by National Key Research and Development Program of China (No.2017YFB0902200) and State Grid Corporation of China Research Program(No.2017GW-20).

Abstract:  In the regional power grid with high wind power penetration rate in China, the wind power has anti-peaking characteristics, which harms the safe operation of the power system. The source side regulation are gradually lacking, and developing the peak-shaving capability of distributed electric heating load is an effective way to solve this problem. In this paper, an electric heating load model based on building parameters and a peak-shaving capability evaluation model are established. Then the peak-shaving experiment is carried out to verify the feasibility and fit the model parameters in the severe cold region. Finally, on the basis of simulation, the peak-shaving capability of typical residential building in the severe cold region is given from two aspects: time-shift power and peak-shaving cost. And the factors affect the time-shift power and peak-shaving costs are analyzed.

Key words: electric heating load, peak-shaving capability, time-shift power, peak-shaving cost

CLC Number: