[1] |
LIU Minghua, LIU Wenxia, LIU Chenmiao, LIU Zongqi, LI Shouqiang, ZHANG He, YAN Hao, PU Zheyong.
Day-Ahead Optimal Dispatching of Heating System When Electrode Boiler Participating in Frequency Regulation Service
[J]. Electric Power Construction, 2020, 41(1): 1-2.
|
[2] |
JIA Yanbing,LI Yubo,MA Jinbi,TIAN Jinjie,WANG Jinhao,LI Huipeng.
Small-Signal Stability Analysis on Grid Connection of DFIG Considering Wind Speed Partition
[J]. Electric Power Construction, 2018, 39(7): 97-106.
|
[3] |
LIN Qingming, HU Xu, BIAN Xiaoyan, LI Haixia, JIANG Ying.
Multi-Turbine Equivalent Frequency Control Considering Wake Effect of Offshore Wind Farms
[J]. Electric Power Construction, 2018, 39(2): 116-.
|
[4] |
FU Yang,MA Yuan,LIU Lujie,TANG Zhengqi,TU Niehua.
Phasic Preventive Maintenance Strategy of Offshore Wind Turbines
[J]. Electric Power Construction, 2017, 38(6): 124-.
|
[5] |
XU Ke, LIU Hong, TIAN Zhe, WANG Bo, NIU Jide.
Economic Probability Analysis of Urban Distributed Energy Supply System
[J]. Electric Power Construction, 2017, 38(2): 138-.
|
[6] |
LIU Yuan, YANG Jun, YANG Bingquan, ZHU Xu, CHEN Yan, WANG Xuan.
Bi-Level Planning Method for Distribution Network with 'WT-PV-Load-ESS'
[J]. Electric Power Construction, 2017, 38(11): 87-.
|
[7] |
HAO Changcheng, WANG Huafeng, YANG Wankai, WANG Binze, ZHOU Liang.
Technology Improvement Scheme and Verification of ±800 kV DC Thyristor Valve
[J]. Electric Power Construction, 2016, 37(2): 112-117.
|
[8] |
HU Meiyu, HU Zhijian.
An Active Distribution System Reliability Evaluation Method Considering Demand Response
[J]. Electric Power Construction, 2016, 37(12): 113-.
|
[9] |
WANG Huijie,FAN Zhiyuan,XU Xiaogang,LI Xinxin.
Prediction Model of Steam Turbine Exhaust Enthalpy Based on Grey Correlation Analysis Method and GSA-LSSVM
[J]. Electric Power Construction, 2016, 37(11): 115-.
|
[10] |
CHEN Shoujun,XIN He,WANG Tao,YANG Jun, PENG Daoxin,TAN Zhongfu.
Heating Operation Scheduling Robust Optimization Model for Heat Storage Electric Boiler Combined with Wind Power
[J]. Electric Power Construction, 2016, 37(1): 103-109.
|
[11] |
MAN Yuwei, YU Guangkai, WEI Huanlin, CHANG Taifu,ZHANG Bo, LU Tiecheng.
Box-Type Transformer Lightning Overvoltage Simulation at Low-Voltage Side in Wind Turbines
[J]. Electric Power Construction, 2016, 37(1): 131-136.
|
[12] |
ZENG Lihua,ZHANG Guo.
Wake Numerical Simulation of Wind Farm Based on MRF
[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(8): 135-140.
|
[13] |
ZHU Yunfei, YAN Weiping, WANG Yupeng, ZHANG Xiaoling, MA Fei.
Technical Economic Analysis and Optimization of Two-Stage Desulfurization System for CFB Boiler
[J]. ELECTRIC POWER CONSTRUCTION, 2015, 36(6): 109-113.
|
[14] |
XIE Shuangyi, JIN Xin.
Influence of Individual Pitch Control on Floating Wind Turbine Performance Based on Wind Shear
[J]. ELECTRIC POWER CONSTRUCTION, 2014, 35(9): 13-17.
|
[15] |
HE Guangling, TONG Hui.
Physical Mechanism of Rotational Fourier Spectrum for Wind Turbine
[J]. ELECTRIC POWER CONSTRUCTION, 2014, 35(8): 119-124.
|