[1]张丽英,叶廷路,辛耀中,等.大规模风电接入电网的相关问题及措施[J].中国电机工程学报,2010,30(25):1-9.
[2]雷亚洲,王伟胜,印永华.一种静态安全约束下确定电力系统风电准入功率极限的优化方法[J].中国电机工程学报,2001,21(6):31-36.
[3]Wiik J, Gjerde J O, Gjengedal T, et al. Steady state power system issue when planning large wind farms[C]//IEEE Power Engineering Society Winter Meeting,New York,2002.
[4]王芝茗,苏安龙,鲁顺.基于电力平衡的辽宁电网接纳风电能力分析[J].电力系统自动化,2010,34(3):86-90.
[5]王乃永,姚金雄,李冰寒.陕西电网"十二五"期间调峰能力研究[J].陕西电力,2010,5(6):14-18.
[6]李付强,王彬,涂少良.京津唐电网风力发电并网调峰特性分析[J].电网技术,2009,33(18):128-132.
[7]衣立东,朱敏奕,魏磊.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132.
[8]孙元章,吴俊,李国杰.风力发电对电力系统的影响[J].电网技术,2007,31(20):55-62.
[9]Zhao X, Morten L, Jacob S. Towards a Danish Power System with 50% Wind-Smart Grids Activities in Denmark[C]//Power & Energy Society General Meeting, IEEE,Calgary, Canada, 2009.
[10]Bechberger M, Reiche D. Renewable energy policy in Germany: Pioneering And exemplary regulations[J]. Energy for Sustainable Development, 2004, 7(7): 47-57.
[11]李俊峰.2012中国风电发展报告[R].北京:中国环境科学出版社,2012. |